My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-171
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 10:23:08 AM
Creation date
9/13/2024 10:21:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/20/2024
Control Number
2024-171
Agenda Item Number
8.W.
Entity Name
Bore Tech Utilities & Maintenance, Inc.
Subject
First Extension to Agreement for Annual Fiber Optic Engineering Design,
Material , Supplies and Installation;
Bid Number
2023056
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum 1 Bid Form <br />Bidder Name: Bore Tech Utilities & Maintenence, Inc <br />Group 3 - Continued <br />Fiber Optic Splicing Terminations - OSP <br />Per <br />Unit Price <br />GR -3-78 <br />FO Splice Closure 12F, Aerial/UG (F&I) <br />EA <br />$ 110000 <br />GR -3-79 <br />FO Splice Closure 12F, Aerial/UG (F only) <br />EA <br />$ 30600 <br />GR -3-80 <br />FO Splice Closure 24F, Aerial/UG (F&I) <br />EA <br />$ 130600 <br />GR -3-81 <br />FO Splice Closure 24F, Aerial/UG (F only) <br />EA <br />$ 30600 <br />GR -3-82 <br />FO Splice Closure 48F, Aerial/UG (F&I) <br />EA <br />$ 169000 <br />GR -3-83 <br />FO Splice Closure 48F, Aerial/UG (F only) <br />EA <br />$ 49000 <br />GR -3-84 <br />FO Splice Closure 96F, Aerial/UG (F&I) <br />EA <br />$ 270000 <br />GR -3-85 <br />FO Splice Closure 96F, Aerial/UG (F only) <br />EA <br />$ 60000 <br />GR -3-86 <br />FO Closure Reentry Kit, Cable Prep (F&I) <br />EA <br />$ 50000 <br />GR -3-87 <br />Splice Tray, Fusion Heatshrink, 12F, 12" (F&I) <br />EA <br />$ s000e <br />GR -3-88 <br />Splice Tray, Fusion Heatshrink, 12F, 12" (F only) <br />EA <br />$ 9000 <br />GR -3-89 <br />Splice Tray, Fusion Heatshrink, 24F, 12" (F&I) <br />EA <br />$ 600 00 <br />GR -3-90 <br />Splice Tray, Fusion Heatshrink, 24F, 12" (F only) <br />EA <br />$ 10000 <br />Fusion Splice Heat Shrink <.ldb OSP includes pigtail as <br />GR -3-91 <br />needed (F&I) <br />EA <br />$ zsoo0 <br />GR -3-92 <br />OTDR Test Any Wavelength Bare Fiber FOSC (I only) <br />EA <br />$ 45000 <br />OSP Construction - Aerial <br />Per <br />Unit Price <br />GR -3-93 <br />Messenger Cable 1/4" (F&I) <br />LF <br />$ , 90 <br />GR -3-94 <br />Remove Messenger Cable 1/4" (1 Only) <br />LF <br />$ 045 <br />GR -3-95 <br />Pole Attach Loose Tube W/1 -Hook Concrete (F&I) <br />EA <br />$ 90 00 <br />GR -3-96 <br />Pole Attach Loose Tube W/J-Hook Wood (F&I) <br />EA <br />$ 4000 <br />GR -3-97 <br />Place Pole Riser 2" GRS (F&I) <br />LF <br />$ .57o0 <br />GR -3-98 <br />Place Riser U -Guard To 20' (F&I) <br />LF <br />$ 640 <br />GR -3-99 <br />Place 2" Riser Sealing Bushing 1-3 Hole (F&I) <br />EA <br />$ 5000 <br />GR -3-100 <br />Place 2" Riser Heatshrink (F&I) <br />EA <br />$ 50 00 <br />GR 3 101 <br />r-GC-AF4f-44 <br />[-A <br />$ <br />i^ocR 3 10c <br />{-: A <br />
The URL can be used to link to this page
Your browser does not support the video tag.