My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-172
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 10:26:16 AM
Creation date
9/13/2024 10:25:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/20/2024
Control Number
2024-172
Agenda Item Number
8.Y.
Entity Name
Southeastern Marine Group, Inc.
Subject
Agreement fir Trans Florida Rail Trail Boardwalk Repairs (2)
Bid Number
2024056
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2024056 Trans Florida Rail Trail Boardwalk Repairs (2) <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Southeastern <br />Marine Group, Inc, (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the <br />mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1— WORK AND PROJECT <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Furnishing all the necessary equipment, materials, and labor for the repair of two boardwalks <br />located on the Trans Florida Rail Trail. <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: Trans Florida Rail Trail Boardwalk Repairs (2) <br />Bid Number: 2024056 <br />Project Address: Trans Florida Rail Trail <br />ARTICLE 2 - CONTRACT TIMES <br />3.01 Time of the Essence <br />All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment <br />as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />The Work will be completed and ready for final payment on or before the 90th day after the date when the <br />Contract Times commence to run. <br />3.03 Liquidated Damages <br />CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will <br />suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 above, plus <br />any extensions thereof allowed in writing as a change order to this Agreement. Liquidated damages will <br />commence for this portion of work. The parties also recognize the delays, expense, and difficulties involved <br />in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. <br />Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated <br />damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $904 for each calendar day that <br />expires after the time specified in paragraph 3.02 for completion and readiness for final payment until the <br />Work is completed and ready for final payment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.