My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-177
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 10:39:49 AM
Creation date
9/13/2024 10:38:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2024
Control Number
2024-177
Agenda Item Number
8.AI.
Entity Name
Indian Coastal Waterways Design & Engineering LLC
Subject
Amendment to Work Order No. 4 for Dune Crossover Replacement of Two Dune Crossover
Ramp Repair at Tracking Station Beach Access
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 4 Amendment 1 <br />Dune Crossover Replacement of Two Dune Crossover Structures and <br />One Dune Crossover Ramp Repair at Tracking Station Beach Access <br />EXHIBIT A — SCOPE OF WORK <br />Dune Crossover Replacement for Two Structures and Dune Ramp Repair at the Tracking Station <br />Beach Access <br />The County seeks to replace two (2) dune crossover access structures that were severely <br />damaged and with two (2) stair dune crossovers at Tracking Station Park. The stair structures are <br />to be designed to minimize storm related damage so that the structure can be made operational <br />in an efficient and timely manner. This proposal is to design and seek state and local permits. <br />Work associated with providing construction administration services provided under Work Order <br />number 4. The objective of this design is to provide a new structure that is more resistant to <br />storm damage through repositioning the new crossover or by design, or a combination of both <br />and provide design for repair to the ramp. <br />The requested professional coastal engineering and environmental services are limited to <br />Permitting, Design Services for replacement of two (2) stair dune crossover access structures at <br />Tracking Station Beach Access: <br />Task 1— Preliminary and Final Design <br />CONSULTANT will prepare preliminary and final design drawings for the proposed project that <br />will consist of a dune crossover structure meeting the design criteria established in the <br />conceptual design task of this scope of work. For each phase, CONSULTANT will provide an <br />opinion of probable costs and meet with the COUNTY to review the design. Final design shall <br />include signed and sealed construction plans and specifications suitable for bidding and <br />construction of the project. <br />CONSULTANT will prepare a preliminary design to be submitted with the permit application and <br />subsequently used to prepare �24 x 36" construction drawings for bidding purposes. The <br />preliminary design will utilize the conceptual design sketches and will be updated with <br />information from the pre -application meeting and our meeting with the COUNTY. <br />Final design drawing updates will be completed after receipt of the permit, as necessary, and <br />shall include signed and sealed construction plans and specifications. For each phase, <br />CONSULTANT will provide an updated opinion of probable costs and meet with the COUNTY to <br />review the design. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.