My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-189
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 11:39:46 AM
Creation date
9/23/2024 11:38:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2024
Control Number
2024-189
Agenda Item Number
8.BA.
Entity Name
Consor Engineers, LLC
Subject
Amendment No.1 Construction Engineering and Inspection Services
for 66th Avenue from 49th Street to 69th Street Roadway Widening FDOT FM No. 436379-1-54-01
Project Number
IRC-1505
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES <br />FOR 66TH AVENUE FROM 49TH STREET TO 69TH STREET ROADWAY WIDENING <br />FDOT FM NO 436379-1-54-01 <br />Project Number: IRC -1505 <br />AMENDMENT NO. 1 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN <br />CONSOR ENGINEERS, LLC AND INDIAN RIVER COUNTY, FLORIDA. <br />This is an amendment to the existing Professional services Agreement (AGREEMENT) <br />dated March 9, 2021, between Consor Engineers, LLC (CONSULTANT) and Indian River County <br />(COUNTY). This amendment addresses changes in "Section 4 — Term; Time for Completion" <br />and "Section 5 — Compensation" of the AGREEMENT. <br />Amendment Description <br />This Amendment includes the following: <br />"SECTION 4 — TERM; TIME FOR COMPLETION" is being modified to incorporate the following: <br />Consultant services are required until the completion and closeout of the project, <br />scheduled no later than April 30, 2025. <br />"SECTION 5 — COMPENSATION" is being modified to incorporate the following: <br />Exhibit A - the Not -To -Exceed amount of $599,859.00 represents the not -to -exceed cost <br />during the period associated with the 502 days added to the contract time through Change <br />Orders/Work Change Directives for extra work, as well as holiday and weather days <br />Total increase of $599,859.00 in a Not -To -Exceed amount brings the AGREEMENT total <br />to $5,098,392.42 for Services to be rendered. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.