My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-189
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 11:39:46 AM
Creation date
9/23/2024 11:38:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2024
Control Number
2024-189
Agenda Item Number
8.BA.
Entity Name
Consor Engineers, LLC
Subject
Amendment No.1 Construction Engineering and Inspection Services
for 66th Avenue from 49th Street to 69th Street Roadway Widening FDOT FM No. 436379-1-54-01
Project Number
IRC-1505
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
502 502 <br />Indian River County has added 502 days (67% increase to the original construction schedule) due to unforeseen Change <br />Orders/Work Change Directives extra work, holiday and weather days delays given to the construction contractor (Halley) which <br />affected the anticipated construction finish of the project. <br />Description <br />Dollars <br />Da s <br />02 <br />53rd Street Bridge Changes (5 -lane) & Redesign <br />$841,817.35 <br />60 <br />60 <br />Change <br />Order <br />016 <br />Revision #14 Changes to 61st & 65th Street Bridges <br />$73,715.44 <br />7 <br />Non -Compensable Time Extension of 105 Calendar Days due to <br />021 <br />Third-PartUtilities <br />$0.00 <br />105 <br />036 <br />Extending Rip Rap at NRC Bridge <br />$55,767.85 <br />10 <br />Non -Compensable Time Extension of 50 Calendar Days due to S7th <br />037 <br />$0.00 <br />50 <br />Work <br />Street Out of Sequence <br />281 <br />Change <br />Revision #25 (Phase IB) - Added Concrete Barrier at 61st & 65th <br />044 <br />Street Bridges <br />$322,502.83 <br />15 <br />Directives <br />059 <br />Plug and Cap Well 65th Street East <br />$10,222.88 <br />15 <br />062 <br />Phase IB Revision #27 - Raising 5-216 P -Top 65th Street East <br />$3,451.15 <br />4 <br />Revision #29 - 69th Street West Typical Section Change (Halley - <br />063 <br />75 <br />RoadwayRework)$51,357.05 <br />Weather Day Time Extensions thru June 2024 <br />124 <br />161 <br />Holiday Day Time Extensions thru June 2024 <br />37 <br />502 502 <br />Indian River County has added 502 days (67% increase to the original construction schedule) due to unforeseen Change <br />Orders/Work Change Directives extra work, holiday and weather days delays given to the construction contractor (Halley) which <br />affected the anticipated construction finish of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.