My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-190
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 11:50:41 AM
Creation date
9/23/2024 11:47:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/20/2024
Control Number
2024-190
Agenda Item Number
8.BB.
Entity Name
State of Florida Department of Transportation (FDOT
Subject
State-Funded Grant Supplemental Agreement for 43rd Avenue Bicycle & Pedestrian Improvements
12th Street to 16th Street;
Project Number
IRC-1818
Document Relationships
2024-191
(Cover Page)
Path:
\Official Documents\2020's\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />Alt Form 525-010-60eA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525.011-0A <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />asizl <br />EXHIBIT A <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 444270-1-54-01 <br />This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and <br />Indian River County (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 43rd Avenue from milepost 4.536 to 5.285 <br />PROJECT DESCRIPTION: Construction 43rd Ave Pedistrian & Bicycle Access Improvements <br />Including but not limited to adding a bike lane 5' wide and restripe, 6' concrete sidewalk that will be ADA compliant. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by n/a. <br />b) Design to be completed by n/a. <br />c) Right -of -Way requirements identified and provided to the Department by n/a. <br />d) Right -of -Way to be certified by n/a . <br />e) Construction contract to be let by n/a. <br />f) Construction to be completed by 6/30/2026 <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.