Laserfiche WebLink
STATE OF FLORIDA <br />MOM 01 WR COUNTY <br />THIS IS TO CERTIFY THAT T I6 A TRUE MID CORRECT <br />COPY OF TyE OR F M T"S OFFICE <br />Alt Form 525-010-W&B STATE OF FLORIDA DEPARTMENT OF TRANSPOBRT D.C. 525-011-0B <br />STATE -FUNDED GRANT AG PROGRAM <br />MANAGEMENT <br />8/21 <br />Page 1 of 1 <br />EXHIBIT B <br />SCHEDULE OF FINANCIAL ASSISTANCE <br />RECIPIENT NAME & BILLING ADDRESS: <br />FINANCIAL PROJECT NUMBER: <br />Indian River County <br />444270-1-54-01 <br />180127m Street <br />Vero Beach, FL <br />MAXIMUM PARTICIPATION <br />TOTAL PROJECT FUNDS <br />LOCAL FUNDS <br />STATE FUNDS <br />Indicate source of <br />PHASE OF WORK by Fiscal Year: <br />Local funds <br />Design -Phase 34 Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />IIn-Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Design Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Right -of -Way- Phase 44Maximum Department Participation <br />$ <br />$ <br />$ <br />In Kind <br />FY: (Insert Program Name) <br />Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />(Insert Program Name) <br />Cash <br />Total Right -of -Way Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Construction- Phase 54 Maximum Department Participation <br />$4,546,186.00 <br />$3,075,576.00 <br />$1,470,610.00 <br />In -Kind <br />FY: 2024 (Small County Outreach Program <br />Cash <br />FY: 2025 Maximum Department Participation <br />$971,714.00 <br />$420,806.00 <br />$550,908.00 <br />In -Kind <br />(Small County Outreach Program) <br />Cash <br />Total Construction Cost <br />$5,517,900.00 <br />$3,496,382.00 <br />$2,021,518.00 <br />Construction Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />Engineering and (Insert Program Name) <br />❑ Cash <br />Inspection - Phase 64 <br />FY: <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Construction Engineering and Inspection Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />(Phase: ) Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />FY: (Insert Program Name) <br />Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />% <br />% <br />% <br />TOTAL COST OF THE PROJECT $5,517,900.00 <br />$3,496,382.00 $2,021,518.00 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Jason Nwamah <br />District Grant Manager Name <br />Signature Date <br />