Laserfiche WebLink
M J MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS <br />1655 27`h St <br />EXHIBIT A <br />Project ID: 21.17.513113 — Sewer Connections (Meeks) <br />Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />Masteller & Moler, Inc. is pleased to presentthe Indian River County Department of Utilities Services <br />(IRCDUS) with this Amendment #1 to Work Order #6 which provides for performance of civil <br />engineering services during the Construction Phase of the project. <br />A brief description of the scope of services and deliverables for this Work Order is provided as follows: <br />SCOPE OF SERVICES <br />Task E — Construction Administration / Observation <br />Task E provides engineering services during the project's construction and completion process generally <br />including the following: <br />1. Process (catalog) and review shop drawing and material submittals and provide recommendations <br />to Utilities Dept. <br />2. Observe the Contractor's construction activities and materials incorporated into the work during <br />periodic site visits. <br />• Prepare and maintain written reports of the Contractor's progress and of significant events <br />affecting the work. <br />• Record noteworthy incidents or events with video and/or still photography. <br />• Observe and document construction testing activities— including materials testing, utility testing, <br />and other related activities. <br />• Observe start-up of pumping systems to verify proper operation. <br />3. Review, comment and recommend approval to County of As -built plans. <br />4. Coordinate and conduct punchlist procedures beginning with Initial Walkthrough within five (5) days <br />of Substantial Completion, and prepare Final Punchlist after construction completion. <br />5. Assemble data and provide project close-out procedures and Engineer's Certifications as required. <br />Upon satisfaction that items of work have been completed in substantial conformance with the <br />project documents, our office will assemble a construction completion package which will be <br />submitted to the Utilities Dept. The package will include inspection reports; field survey data <br />provided by the Contractor; testing data and final As -built plans provided by the Contractor. <br />Deliverables — The ENGINEER shall provide the COUNTY: <br />a. Final Project Construction Completion Documents 1 Hard Copy Set & 1 Electronic <br />TIME SCHEDULE <br />The estimated time frame for completion of services: <br />Page 1 of 2 <br />