My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/22/2024
CBCC
>
Meetings
>
2020's
>
2024
>
08/22/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 2:00:27 PM
Creation date
9/23/2024 1:41:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
08/22/2024
Meeting Body
Board of County Commissioners
Subject
Utility Rate Study Workshop
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. AneysW <br />2.1.2 Adjustments <br />Several adjustments were required to the total fixed assets in-service. First, IRCDUS fixed asset records <br />identified contributed assets which represent assets donated, contributed, or otherwise not funded by <br />IRCDUS and are therefore excluded from the calculation of impact fees to avoid double recovery of these <br />costs. Contributed assets are often local neighborhood collection or distribution assets funded by <br />developers. Second, Stantec deducted general and administrative assets and minor vehicles and <br />equipment that do not represent investment in backbone or capacity related infrastructure. Schedules 3 <br />and 4 of the Appendix summarizes these adjustments to the water and sewer system fixed asset values, <br />respectively. <br />2.1.3 Cost Basis <br />The resulting system values, net of adjustments, for use as the cost basis for calculating the water and <br />sewer impact fees are summarized in Table 2 and Table 3, respectively. <br />Table 2 - Water System Impact Fee Cost Basis4 <br />Description <br />Treatment <br />Transmission <br />Existing Assets: Plant in Service (RCNLD) <br />$59.7M $124.2M <br />Less: Contributed Assets <br />($7.9M) <br />($51.1 M) <br />Net Cost Basis for Impact Fees5 <br />$51.7M <br />$73.1M <br />Table 3 - Sewer System Impact Fee Cost Basis' <br />Description <br />Treatment <br />Transmission <br />Existing Assets: Plant in Service (RCNLD) <br />$79.9M <br />$115AM <br />Less: Contributed Assets <br />($3.0M) <br />($71.4M) <br />Net Cost Basis for Impact Fees' <br />$77.OM <br />$44.OM <br />4 Excludes non -capacity related infrastructure (i.e., administrative assets, meters, vehicles, and minor equipment). <br />5 Totals may not add due to rounding. <br />6 Excludes non -capacity related infrastructure (i.e., administrative assets, meters, vehicles, and minor equipment). <br />I Totals may not add due to rounding. <br />0 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.