My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/22/2024
CBCC
>
Meetings
>
2020's
>
2024
>
08/22/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 2:00:27 PM
Creation date
9/23/2024 1:41:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
08/22/2024
Meeting Body
Board of County Commissioners
Subject
Utility Rate Study Workshop
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Results <br />Table 7 - Proposed Impact Fees (per ERU) <br />Service <br />Existing <br />FY 2025 <br />FY 2026 <br />FY 2027 <br />FY 2028 <br />Cumulative <br />Change <br />Water <br />$1,300 <br />$1,463 <br />$1,626 <br />$1,789 <br />$1,952 <br />$ Change <br />- <br />$163 <br />$163 <br />$163 <br />$163 <br />$652 <br />% Change <br />12.5% <br />11.1% <br />10.0% <br />9.1% <br />50.0% <br />Sewer <br />$2,796 <br />$2,624 <br />$2,624 <br />$2,624 <br />$2,624 <br />$ Change <br />- <br />($394) <br />$0 <br />$0 <br />$0 <br />($394) <br />% Change <br />(14.0%) <br />0.0% <br />0.0% <br />0.0% <br />(14.0%) <br />The increases to the water impact fees moves them closer to IRCDUS' actual cost of the infrastructure to <br />support system expansion. Additionally, Stantec recommends that IRCDUS review its water and sewer <br />impact fees periodically (approximately every four years) to ensure that they remain fair and equitable and <br />continue to reflect its current cost of capacity. <br />3.2 DEMONSTRATED NEEDS ANALYSIS <br />The calculated water impact fees exceed the phase-in limitations as outlined in Section 1.2 Legal <br />Requirements herein. However, the Florida Impact Fee Act11 allows for exceptions to the phase-in <br />limitations in the event the County provides a study which expressly demonstrates the extraordinary <br />circumstances driving the need to exceed the phase-in limitation. Therefore, the County could pursue a <br />separate demonstrated needs analysis to the extent it desires to fully implement the resulting fees identified <br />herein. <br />3.3 METHOD OF COLLECTION <br />IRCDUS currently imposes its water and sewer impact fees from individually metered and master -metered <br />customers based on ERUs for each new connection. This approach is one that is used throughout Florida <br />and the industry and Stantec recommends that the County continue this method of application and <br />collection for the impact fees. <br />11 The statute does not apply to water and sewer connection fees. Fla. Stat. § 163.31801 (12) (2023). <br />0 120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.