Laserfiche WebLink
System Capacities Schedule 2 <br />Water System Sewer System <br />Water Treatment Plants <br />Capacity (MGD)' <br />Hobart WTP <br />Oslo WTP <br />9.828 <br />6.400 <br />6.000 <br />0.017 <br />16.22800 <br />Average/Peak Day: <br />I Average <br />Capacity (MGD) <br />ssion Lines <br />Wastewater Treatment Plants <br />Capacity (MGD) <br />Central WWTF <br />South WWTF <br />West WWTF <br />Blue Cypress WWTF <br />4.000 <br />2.000 <br />6.000 <br />0.017 <br />12.02 <br />Average/Peak Day: <br />Average <br />ransmission Lines <br />Capacity (MGD) <br />16.23 1 1 12.02 <br />Average/Peak Day: I era a Average/Peak Day: I Averag <br />1 Average day based on IRCDUS' current consumptive use permit. <br />E 150 <br />