My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/22/2024
CBCC
>
Meetings
>
2020's
>
2024
>
08/22/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 2:00:27 PM
Creation date
9/23/2024 1:41:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
08/22/2024
Meeting Body
Board of County Commissioners
Subject
Utility Rate Study Workshop
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Revenue Sufficiency Analysis <br />In FY 2024, all O&M expenses and minor capital outlays were based upon the FY 2024 Budget provided <br />by IRCDUS. Beginning in FY 2025, O&M expenses were based upon IRCDUS' preliminary FY 2025 <br />Budgets, adjusted each year by assumed cost escalation factors to reflect future inflation. <br />Capital Improvement Plan <br />One of the most important elements of a utility's financial plan is to ensure that there is continuous <br />reinvestment in existing infrastructure to provide quality utility services and investment in new infrastructure <br />to support new growth in the system. IRCDUS10 provided the CIP in project level detail from FY 2024 <br />through FY 2028. Stantec and IRCDUS staff discussed the expected annual capital spending, timing of the <br />projects, and reviewed potential funding methods for each project. The RSA includes annual capital project <br />spending beginning in FY 2029 related to future projects that have not yet been defined by IRCDUS in its <br />CIP including dollars for future water and sewer capacity expansions beginning in FY 2032 as provided by <br />IRCDUS may be modified and further delineated as appropriate in the future. It is important to note that <br />IRCDUS is initiating a master plan that may identify capital needs in addition to those presented herein. As <br />these projects and associated costs are defined, they should be considered in future rate studies. A detailed <br />list of projects and costs by year can be seen on Schedule 6 of Appendix A while a summary of IRCDUS' <br />CIP from FY 2024 through FY 2028 in current day dollars relied on for this Study is provided in Table 6. <br />Table 6 — Capital Improvement Plan (2024 dollars) <br />Description <br />FY 24 <br />FY 25 <br />FY 26 <br />FY 27 <br />FY 28 <br />Total <br />Capital Improvement Plan <br />$37.61VI <br />$33.91VI <br />$37.4M <br />$19.01VI <br />$30.01VI <br />$157.9M <br />2.3 ASSUMPTIONS <br />The following section presents the assumptions, policies, and parameters of the RSA: <br />2.3.1 Customer Growth & Demand Projections <br />The RSA reflects annual retail customer growth projections of 1,250 water ERUs and 1,350 sewer ERUs. <br />Based upon these new connections, the average annual growth rate in ERUs is 1.6% for the water system <br />and 2.3% for the sewer system. This assumption recognizes that IRCDUS has completed various septic to <br />sewer projects and will experience additional conversions. The RSA reflects growth in billed volume that is <br />equal in each year to the projected growth in water and sewer customers. <br />s As of March 7, 2024. <br />10 Provided to Stantec on November 28, 2023. <br />a <br />10 <br />• <br />�J <br />
The URL can be used to link to this page
Your browser does not support the video tag.