Laserfiche WebLink
IRC-1505 <br /> Change Order Concurrence <br /> No. 03 <br /> DATE OF ISSUANCE:01/09/2023 EFFECTIVE DATE:01/09/2023 <br /> OWNER: Indian River County <br /> CONTRACTOR Halley Engineering Contractors, Inc. <br /> Project: 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69Th STREET) <br /> OWNER'S Project No. IRC-1505 OWNER'S Bid No. 2021018 <br /> FM No.: 436379-1-54-01 &436379-1-54-02 <br /> You are directed to make the following changes in the Contract Documents: <br /> Description: <br /> Proceed with construction of 53rd Street Signalized Intersection at 66th Avenue in accordance with <br /> Simmons &White (Engineer-of-Record) plans Signed & Sealed dated September 28, 2022 (see Exhibit <br /> As a result,the following new pay items will be added to the Contract for means of compensation for <br /> this extra work in accordance with the Specifications&Contract Documents: <br /> PHASE IA SIGNALIZATION-53RD STREET <br /> NEW PAY CO#03 CO#3 UNIT <br /> ITEM NO. DESCRIPTION UNIT QTY PRICE CO#03 TOTAL <br /> 101-1 MOBILIZATION/DEMOBILIZATION LS 1 $ 65,680.00 $ 65,680.00 <br /> 102-1 MOT LS 1 $ 16,249.00 $ 16,249.00 <br /> 110-1-1 CLEARING AND GRUBBING LS 1 $ 3,450.00 $ 3,450.00 <br /> 630-2-11 CONDUIT(SIGNAL)(F&I)(UNDERGROUND) LF 236 $ 58.80 $ 13,876.80 <br /> 630-2-12 2"CONDUIT SIGNALS(F&I)(UNDER LF 300 $ 58.80 $ 17,640.00 <br /> PAVEMENT) (DIRECTIONAL BORE)(5 RUNS) <br /> 630-2-12 2"CONDUIT SIGNALS(F&I)(UNDER LF 220 $ 58.80 $ 12,936.00 <br /> PAVEMENT) (DIRECTIONAL BORE)(1 RUN) <br /> 630-2-12 2"CONDUIT SIGNALS(F&I)(UNDER LF 150 $ 58.80 $ 8,820.00 <br /> PAVEMENT) (DIRECTIONAL BORE)(6 RUNS) <br /> 632-7-1 SIGNAL CABLE(F&I) PI 1 $ 17,325.00 $ 17,325.00 <br /> 633-2-31 FIBER OPTIC CONNECTION (INSTALL) (SPLICE) EA 1 $ 55.34 $ 55.34 <br /> 633-3-11 FIBER OPTIC CONNECTION HARDWARE (F& I) EA 12 $ 1,627.50 $ 19,530.00 <br /> (SPLICE ENCLOSURE) <br /> 633-3-15 FIBER OPTIC CONNECTION HARDWARE (F&I) EA 1 $ 1,811.25 $ 1,811.25 <br /> (PATCH PANEL, PRETERMINATED) <br /> 635-2-11 PULL &SPLICE BOX(F& I)(SIGNAL) EA 22 $ 1,680.00 $ 36,960.00 <br /> 635-2-12 PULL&SPLICE BOX(F&I)(SIGNAL) (24 x 36) EA 1 $ 2,630.25 $ 2,630.25 <br /> 639-1-122 ELECTRICAL POWER SOURCE(F&I) AS 1 $ 3,843.00 $ 3,843.00 <br /> (UNDERGROUND) <br /> 639-2-1 ELECTRICAL SERVICE WIRE(F&I) LF 300 $ 6.72 $ 2,016.00 <br /> PAGE 1 OF 3 <br />