Laserfiche WebLink
IRC -2411 <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Jim's <br />Complete Construction, LLC (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration <br />of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1— WORK AND PROJECT <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />This project consists of temporarily relocating portable cubicle workstations, the demolition and <br />removal of all existing vinyl flooring including existing vinyl wall base. To clean and prepare the existing <br />concrete floor with the intention of furnishing and installing a floor leveler as needed for installing a <br />glued in place Luxury Vinyl Tile (LVT). <br />Provide moisture testing of existing concrete floor prior to installation. To furnish and install <br />approximately 3,400 SF of Luxury Vinyl Tile flooring with the proper manufacturer's adhesive. To furnish <br />and install new 4" vinyl wall base (with toe). After the new floor installation is completed, return and <br />secure all cubicles and workstations to their previous locations. Contractor is responsible for applying for <br />and obtaining the Building Permit. <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: Indian River County Tax Collector Floor Replacement (IRC -2411) <br />Bid Number: 2024057 <br />Project Address: 1800 27`h Street, Building "B", Vero Beach, FL 32960 <br />ARTICLE 2 — TERM <br />N/A <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment <br />as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />The Work will be completed and ready for final payment on or before the 30th day after the date when the <br />Contract Times commence to run. <br />3.03 Liquidated Damages <br />CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will <br />suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 above, plus <br />Page 23 of 34 <br />