Laserfiche WebLink
BUILDING <br />DIVISION 3 <br />CONCRETE - SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />64 L648.G7 S <br />611.648.67 <br />DIVISION 4 <br />MASONRY -SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />_ S <br />DIVISION 5 <br />METALS- SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />22,539,29 S <br />_ <br />22,539.29 <br />DIVISION 6 <br />WOOD, PLASTICS, AND COMPOSITES- SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />46,247.02 S <br />46 X97.02 <br />DIVISION 7 <br />THERMAL AND MOISTURE PROTECTION- SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />200,742.79 S <br />300,742.79 <br />DIVISION 8 <br />OPENINGS- SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />488.461.21 S <br />488,461.21 <br />DIVISION 9 <br />FINISHES- SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />417,177.47 S <br />417,177.47 <br />DIVISION 10 <br />SPECIALTIES-SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />44,575.10 S <br />14,575.50 <br />DIVISION 11 <br />EQUIPMENT- SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />24,392.16 S <br />24,392.16 <br />DIVISION 12 <br />FURNISHINGS-SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />99,843.68 S <br />99,843.68 <br />DIVISION 13 <br />SPECIAL CONSTRUCTION- SEE ENGINEERING DRAWINGSAND SPECIFICATIONSLS1 <br />E <br />DIVISION 15 <br />MECHANICAL/PLUMBING- SEE ENGINEERING DRAWINGS AND SPECIFICATIONSLS <br />1 <br />786,959.10 S <br />786.959.10 <br />DIVISION 16 <br />ELECTRICAL- SEE ENGINEERING DRAWINGS AND SPECIFICATIONS <br />LS <br />1 <br />544.323.95 S <br />544.323.95 <br />BUILDING SUBTOTAL <br />$ <br />.311.060.84 <br />999-1 <br />ASBUILT SURVEYING AND RECORD DRAWING PREPARATION (BY REGISTERED SURVEYOR) <br />LS <br />1.0 <br />82,593.26 5 <br />82.593.20 <br />SUB-TOTAL - <br />999-25A <br />S <br />,562.589,72 <br />FORCE ACCOUNT= <br />S <br />570,000.00 <br />TOTAL PROJECT BID AMOUNT (INCLUDING FORCE ACCOUNTSI <br />= <br />S <br />,132589.72 <br />LS--LUMP Sum AC=Acre EA=Each ry=n.h:, v.a cv_c.,....._ ,. <br />•� •••-.v- -- -,- Na=n55emmy <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS SUMMARY OF PAY ITEMS AND THE ITEMIZED <br />Seven Million, One Hundred Thirty Two Thousand, Five Hundred Eighty Nine Dollars and Seventy Two Cents <br />TOTAL PROJECT BID AMOUNT IN WORDS <br />