My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-198
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 12:24:48 PM
Creation date
9/26/2024 12:22:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2024
Control Number
2024-1998
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment No. 2 to Work Oder No. 1 for Phase 2 Segment 3, Cell 3 Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geospte& <br />consultants <br />Mr. Himanshu Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />1325 74th Avenue SW <br />Vero Beach, Florida 32968 <br />1200 Riverplace Blvd., Suite 710 <br />Jacksonville, Florida 32207 <br />PH 904.858.1818 <br />www.geosyntec.com <br />24 July 2024 <br />Subject: Amendment 2 - Engineering and Construction Support Services Project <br />Phase 2 - Construction Cell 3 Liner Construction <br />Indian River County Class I Landfill <br />Vero Beach, Indian River County, Florida <br />Geosyntec Project No. FL9363B <br />Dear Mr. Mehta: <br />Geosyntec Consultants, Inc. (Geosyntec) is pleased to submit this proposal to the Indian River <br />County (IRC) Solid Waste Disposal District (SWDD) to provide additional engineering design <br />and construction support services related to the Phase 2 - Cell 3 liner construction of the Class I <br />Landfill (hereafter referred to as the Project) at the IRC Landfill (IRCL) facility located in Vero <br />Beach, Florida. The additional engineering and construction support services are required to <br />complete the construction of the Cell 3 liner and leachate control systems to facilitate preparation <br />of the construction completion certification report for submittal to FDEP. This proposal presents <br />the scope of work, schedule, and budget estimate for the additional services related to Phase 2 — <br />Segment 3 Cell 3 liner construction activities and was prepared in response to a request from <br />Mr. Himanshu Mehta, P.E., Managing Director of SWDD following discussions between him <br />and Mr. Ron T. Jones, BCEE, Assistant Managing Director of SWDD and Dr. Timothy <br />Copeland, P.E and Dr. Kwasi Badu-Tweneboah, P.E. both of Geosyntec. <br />Geosyntec has prepared this proposal (professional services) as Exhibit A of Amendment 2 to <br />Work Order No. 1, pursuant to that certain Continuing Contract Agreement for Professional <br />Services, dated 4 April 2023 (collectively referred to as the "Agreement"), by and between <br />INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and <br />Geosyntec ("Consultant"). The remainder of this proposal is organized to present: (i) project <br />background; (ii) proposed scope of work; (iii) and budget estimate. <br />FL936313-O1/JL24046 Segment 3 Cell 3 Liner Construction Amendment 2.doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.