My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-198
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 12:24:48 PM
Creation date
9/26/2024 12:22:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2024
Control Number
2024-1998
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment No. 2 to Work Oder No. 1 for Phase 2 Segment 3, Cell 3 Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />24 July 2024 <br />Page 4 <br />and participation in weekly construction progress meetings, preparation meeting minutes, and <br />review of contractor's submittals including payment application requests and time and material <br />billing reports. <br />Phase 8 — Miscellaneous Engineering Support Services <br />This phase addresses the additional engineering support services associated with the operation of <br />the Class I Landfill including the submersible pumps located in Cell 2 and Leachate Lift Station. <br />During project progress meetings with SWDD, Geosyntec was asked to evaluate replacing the <br />submersible pumps located in the Cell 2 LDS manhole and in the main Pump Station for Cells 1 <br />to 4. <br />Geosyntec is also assisting SWDD to evaluate the timelines for placing waste in the north slopes <br />of Cell 2 as well as recommendations/suggestions regarding the existing landfill gas (LFG) <br />systems in the area. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Phase 1, 3, 4, & 8 of this proposal is <br />summarized in the following table. A detailed budget estimate is provided as Attachment B. <br />• Phase 1 — General Consulting/Meeting Support/Project Management $3,710.07 <br />• Phase 3 — QA/QC Services $130,214.30 <br />• Phase 4 — Construction Management $24,950.45 <br />• Phase 8 — Miscellaneous Engineering Support Services $11,630.38 <br />TOTAL $170,505.20 <br />Geosyntec will not exceed the cost estimate without prior approval and written authorization <br />from SWDD. <br />FL9363B-Ol/JL24046 Segment 3 Cell 3 Liner Construction Amendment 2.doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.