My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-198
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 12:24:48 PM
Creation date
9/26/2024 12:22:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2024
Control Number
2024-1998
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment No. 2 to Work Oder No. 1 for Phase 2 Segment 3, Cell 3 Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peavey & Associates <br />Surveying & Mapping, PA <br />9399 North Lake Buffum Road Fort Meade, F133841 <br />Phone: 863-738-4960 <br />Email: DebPeavey(a)peave. shying com <br />June 27, 2024 revised <br />Mr. Kwasi Badu-Tweneboah, Ph. D. P.E. <br />Geosyntec Consultants <br />1200 Riverplace Boulevard, Suite 710 <br />Jacksonville, Florida 32207 <br />RE: Indian River County Vero Beach <br />Landfill Cells 3 Construction <br />I am pleased to offer the following proposal for surveying services at the above referenced <br />project location. <br />1. SCOPE OF SERVICES <br />The project consists of the following surveying services located at the above location as <br />follows: <br />PHASE 1 -Site Preparation Surveying <br />• Task Four- Stakeout locations of groundwater monitoring wells and gas monitoring <br />probes. <br />• Task Five- Survey TOC (northing, easting, and elevation in NGVD29) for individual <br />wells. Survey shall be prepared in accordance with the FDEP permit. Providing three <br />(3) signed and sealed hard copies and electronic file. <br />PHASE 11- Cell Construction Surveying <br />• Task One: As -built survey of the preparation of the liner grade surface & anchor <br />trench. (3 trips) <br />• Task Two: As -built survey of the secondary liner geomembrane. Panels, repairs, <br />destructs. (4 trips) <br />• Task Three: As -built survey of the primary liner geomembrane. Panels, repairs, <br />destructs, and liner tie-in. (4 trips) <br />• Task Four: As -built survey of the 2' protective layer surface. (4 trips) <br />• Task Five: As -built of the leachate collection system corridor pipes, <br />sumps, manholes, force main, etc. (2 trips) <br />• Task Six: As -built survey of the final improvements. Edge of liner markers and <br />stormwater improvements. (2 trips) <br />• Task Seven: Volume calculations for conformance check and for <br />measurement and final payment purposes. <br />Peavey & Associates Page 1 Surveying & Mapping, PA <br />
The URL can be used to link to this page
Your browser does not support the video tag.