Laserfiche WebLink
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Viking Painting, LLC, (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows.- <br />ARTICLE <br />ollows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />PROJECT DESCRIPTION: The proposed project consists of work necessary to rehabilitate <br />the 400,000 -gallon multi -leg steel elevated potable water storage tank located in Indian <br />River County, Florida, including the following: site preparation, selective demolition and <br />replacement of corroded sway rods, hub rods and associated hardware, replacement of <br />corroded horizontal members, gusset connections and associated hardware, <br />reinforcement of horizontal members and gusset plates, reinforcement of ladder rungs and <br />blockage of ladder access until repaired, removal of loose conduits and feedlines, coating <br />of new metalwork and hardware, removal of damaged or corroded paint and re -coating and <br />all accessory items to provide a complete and structurally sound system as outlined in <br />these documents. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Gifford Elevated Storage Tank Modification & Rehabilitation <br />County Project Number: IRC -13.23.538 <br />Bid Number: 2024047 <br />Project Address: 4680 28" Court, Vero Beach, FL 32967 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County IRC Dept of Utility Services designated engineer or engineering <br />representative is hereinafter called the ENGINEER and will act as OWNER's representative, <br />assume all duties and responsibilities, and have the rights and authority assigned to <br />ENGINEER in the Contract Documents in connection with the completion of the Work in <br />accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />