Laserfiche WebLink
for the duration of this agreement, as required by Section 448.095, F.S. CONTRACTOR is <br />also responsible for obtaining an affidavit from all subcontractors, as required in Section <br />448.095(5)(b), F.S., stating the subcontractor does not employ, contract with, or subcontract <br />with an unauthorized alien. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-10, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); <br />6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the <br />Work (page 00634-1); <br />9. General Conditions (pages 00700-1 to 00700-38, inclusive); <br />10. Supplementary Conditions (pages 00800-1 to 00800-13, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical <br />Provisions); <br />12. Drawings consisting of a cover sheet (G-1), and sheets numbered M-1 through M-4, <br />inclusive, and sheets numbered D-1 through D-2, inclusive, with each sheet bearing the <br />following general title: South Oslo Road Water Treatment Plant Sand Strainer <br />Replacement <br />13. Addenda 1 through 2; <br />14. Appendices to this Agreement (enumerated as follows): <br />Appendix A — Permits <br />15. CONTRACTOR'S BID (pages 00310-1 to 00310-6, inclusive); <br />5 <br />