My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-246
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 1:52:07 PM
Creation date
10/21/2024 1:50:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/24/2024
Control Number
2024-246
Agenda Item Number
12.E.1.
Entity Name
Dickerson Infrastructure, Inc. dba Dickerson Florida, Inc.
Subject
Section 00520 Agreement (Natural Resources Dept.) for Sector 4 Hurricane Nicole &
Ian Dune Renourishment Project;
Project Number
IRC-2318
Bid Number
2024005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Agreement (Natural Resources Department) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Dickerson Infrastructure Inc. dba Dickerson Florida, Inc (hereinafter called <br />CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project includes dune renourishment within the County's Sector 4 <br />Project Area via the placement of approximately 135,000 cubic yards of beach - <br />compatible sand fill and the installation of about 147,788 native dune plants over <br />approximately 2.86 miles of Atlantic Ocean beach in Indian River County. Sand fill <br />is proposed to be obtained from either (a) an upland sand source pre -qualified by <br />the County, and/or (b) an upland sand source separately approved by the Florida <br />Department of Environmental Protection. To avoid adverse impacts to nesting sea <br />turtles, construction is expected to be completed during the period of November 1, <br />2024 to April 30, 2025 <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only <br />a part is generally described as follows: <br />Project Name: - SECTOR 4 HURRICANES IAN & NICOLE DUNE <br />RENOURISHMENT PROJECT - <br />County Project Number: IRC -2318 <br />Bid Number: 2025004 <br />Project Address: SECTOR 4 INDIAN RIVER COUNTY <br />ARTICLE 3 - ENGINEER <br />3.01 Coastal Technology Corporation is hereinafter called the ENGINEER and will act as <br />OWNER's representative, assume all duties and responsibilities, and have the rights and <br />authority assigned to ENGINEER in the Contract Documents in connection with the <br />completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />'APurchasinc\13ids\2024-2025 FY (2025000)\2025004 Sector 4 Hurricanes Ian and Nicole Dune Restoration\Drafts\#1.0_DIV 0_1_Bid and Contract Doc_20240801-final Ac<:x <br />
The URL can be used to link to this page
Your browser does not support the video tag.