My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-246
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 1:52:07 PM
Creation date
10/21/2024 1:50:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/24/2024
Control Number
2024-246
Agenda Item Number
12.E.1.
Entity Name
Dickerson Infrastructure, Inc. dba Dickerson Florida, Inc.
Subject
Section 00520 Agreement (Natural Resources Dept.) for Sector 4 Hurricane Nicole &
Ian Dune Renourishment Project;
Project Number
IRC-2318
Bid Number
2024005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and regulations or requirements that are contrary to any provision of the Local Government <br />Prompt Payment Act. In such event, payment and retainage provisions shall be governed <br />by the applicable grant requirements and guidelines. <br />6.05 Acceptance of Final Payment as Release. <br />A. The acceptance by the CONTRACTOR of final payment shall be and shall operate <br />as a release to the OWNER from all claims and all liability to the CONTRACTOR <br />other than claims in stated amounts as may be specifically excepted by the <br />CONTRACTOR for all things done or furnished in connection with the work under <br />this Contract and for every act and neglect of the OWNER and others relating to or <br />arising out of the work. Any payment, however, final or otherwise, shall not release <br />the CONTRACTOR or its sureties from any obligations under the Contract <br />Documents or the Public Construction Bond. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, the Florida Department of Emergency <br />Management (FDEM) and others in accordance with paragraph 6.20 (Indemnification) of <br />the General Conditions to the Construction Contract. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all as applicable: (1) reports of explorations and tests of <br />subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or <br />relating to existing surface or subsurface structures at or contiguous to the Site (except <br />Underground Facilities) which have been identified in the Supplementary Conditions as <br />provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a <br />Hazardous Environmental Condition, if any, at the Site which have been identified in the <br />Supplementary Conditions as provided in paragraph 4.06 of the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done <br />so) all additional or supplementary examinations, investigations, explorations, tests, studies, <br />and data concerning conditions (surface, subsurface, and Underground Facilities) at or <br />contiguous to the Site which may affect cost, progress, or performance of the Work or which <br />relate to any aspect of the means, methods, techniques, sequences, and procedures of <br />construction to be employed by CONTRACTOR, including applying the specific means, <br />methods, techniques, sequences, and procedures of construction, if any, expressly required <br />Agreement (Public Works) REV 04-07 - 00520 - 5 <br />F:\Purchasing\Bids\2024-2025 FV (2025000)\2025004 Sector 4 Hurricanes Ian and Nicole Dune Restoration\D rafts\# LOD IV 0_1_Bid and Contract Doc_20240801-final.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.