My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
08/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 12:30:46 PM
Creation date
10/24/2024 10:57:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
826
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2024 -0231 -PAA -EQ <br />DOCKET NO. 20240055 -EQ Attachment A <br />PAGE 11 Page 6 of 42 <br />FL0PMAP0V1rW*UMrC0MPAW original Sheet N6S.033.1 <br />(Continue from She No. 903) <br />5-53 A certificate addressed to FPL from aticensed Professional Engineer (reasonably acceptable to FPL in all <br />respects) stating; (a) the nameplate capsoitytating of the Facility at the anticipated time of commercial operation, <br />which must be I at least 94%, of the Expected Nam eplate Capacity Rating; QY) iWthe Facility is able to generate <br />electric erleray'Wiablyin amounts expected by this Agreement and, in accordance with all other terms and <br />conditions hereof; (c) that Start -Up Testing of the Facility has been completed; and (d) that, pursuant to Section 8.4, <br />all.system protection and controland Automatic Generation Control devices are installed'and operational. <br />5.5.2 A certificate addressed to FPL lircan a acceptable to FPL in all <br />respects) stating, in conformance with the requirements of the Interconnection Agretasent, that: (a) all required <br />interconnection facil itics have boo constructed; (b) all required interconnection -teats --have been completod; and (c) <br />the Facility is physically interconriected with the Systern in contonnance with the :Entervortnection Agreement and <br />able to deliver energy crmsistcnt with the terms of this Agreement <br />5.5. A certificate addressed from a E:nginecr (reasonably acceptable to FM.. in all <br />respects) stating chat. QS ]iss obtained or entered into all perinits, and aUxecenents with respect to the Facility <br />accessary for comtructicinL, awriership, operation, and maintenance or the Facility (the '*Required Agreements"). Q3 <br />must.provide copies of any or all Required Agreements requested by FPL. <br />53.4 An opinion front a low rum or attorney, registered or licensed in the $taw of Florida (reasonably <br />acceptable to FPL in all respects), sating, after all appropriate and reasonable inquiry, that: (a) QS has obtained or <br />entered into all Required Agreements, (b) neither (43 nor the Facility is in violation of or subject to any liability <br />mor4;"ea. dft& of uwt. wid othw:vaitiop &aortod iftlsactiow 9i.7. <br />5.5,5 FM bas recelved,*W anca.,Slev <br />I.,hav <br />hwebeen sat iormd:ear hzvw:ocaurm-4, or io-' Vnithspeoificit what. <br />'Y' <br />satisfied: <br />m I <br />1� =Astls M�.' 9r, 0 T� 0 1 h <br />AAMAN <br />UEM777-i 7 Z M -M <br />m,,oridu to:achieve the Capacity DoUvery Date. Ifthe Q&ftils to achim <br />t to tion to rave <br />uuwsmW.ixt**y LWat b) such Tiler date As poliWo by • nUAL ftd�080C*lo onlip <br />CWad* payments under this Contract and FPL will be pwmifti iw4A=*mkft Contract, consistent with the <br />term$ hftK without further obl4ptiorL% duties or liabiftlo ft Q8. <br />lxn"by: Tiffasky Colken, Director, Ralev and Tariffi <br />r6ft-five. Julie 5, 2018 <br />23 -60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.