My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
08/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 12:30:46 PM
Creation date
10/24/2024 10:57:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
826
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2024 -0231 -PAA -EQ <br />DOCKET NO. 20240055 -EQ <br />PAGE 18 <br />FLORH)APOWER&LIGIff COMPANY <br />Attachment A <br />Page 13 of 42 <br />(Continued from SliedWbCOW) <br />12. Default <br />Nkitivithstanding the occurrence cfany Force Majeure as described in Section 16, each ofthe following shall constitute an Event of <br />Ddault <br />12.1 The QS Ms to meet the applicable requirements specifiedmi.Section 1 of this Contract.; <br />1Z2'ftQ9 chu*es or inodifles the Facility froto that providedJaSection I with respect to its type, location. iechnoiog of lud <br />WOWWWx4pior written approval Rom FpLi <br />12.3 After the Capacity Delivery Date, the FaddlWtAk ft tj0dftja2 <br />440nWituive months. to maintain an.Autnual Calveity <br />Billing Factor, wdescribed in Appendix B, datheiJAIIi,; <br />12.4 The QS fails to comply with any of the provisions of Section 9k bereof Security), <br />12.5 The QS A& ID comply with any of die provwm of Section 10,0 hereof (Termitilmon Somty).; <br />IZfTW Q9 causes the coilduct of slative bodwool; tit: Jf*0%4r0 widaft Word lisiftio"hol, 6tirad dog be <br />instituted by or for err against the QS or if araoibilvollatt be appointed for the QS or any of its assets or <br />part of the QS's assets shall be attached, IwW lopoo, encumbered, pledged, seized c* taken under any judicial process, slut <br />such Proceedings Shall 1101 be Vaculed or fully stayed within 30 days thereof,, or it die QS shill make an assignment for the <br />benctit of creditors, or admit in writing its inability to pay its debt,,; as they baootm due, <br />117 The QS fails to give proper assurance acceptable to FPL ofacloquato performance as specified un deo this Contract within 30 <br />days otter FPL, with reasonable grounds for insccufity, has requested in writing such assurance, <br />12,8 IIwQS materially fails toperform as specified winder this Confract, iWuduiL bit rout limited to, *QS'sobb ', is <br />pta_ war <br />my pan of Sections 8, and 18, <br />119 TbvQff A&Io achieve the permitting, liceivring,cerfification, und all Woridt able and local governmental environmerild and <br />4*00fig approvals required to initiate construction of the Facility by no later ffian one year prior to Guaranteed C %paci ty Date. <br />1230 The QS fails to comply with any of the provisions of Section 18.3 hereof (Project Management). <br />1Z11 Anyof the representations or warranties made, by the QS in tbis Contract is Use or misleading in any material respect. <br />12.12 Thaaccurreive of an event of default by the QS under the Intercomection.AgTeement or any applicable NhIieeling <br />Agwouterd; <br />17.13 Tbo QS Us to satisfy its obligations under Section Mj4bWwjVssijmmeM). <br />1114 The QS fails to deliver to FPL in accordance with this Contract any "y or &m capacity required to be delivercd <br />hereunder or the delivery or sale of any such energy and turn capacity to an entity other than FPL. <br />J2.15 The.,,:QS fails to perform any material covenant or obligation tinder this Contract not specifically mentioned in this Section <br />12.16 If at any time after the Capacity Delivery Date, the QS reduces the Committed Capacity due to an event of Force Majeure <br />and fails to. repair the Facility and,reset the Coriarnitted, Capacity to the level set forth in Section 5.1 (as such level may be <br />reduced by Sefton 5.3) willitkit twelve (12) ructift following the occurrence of such event of Force Majeure. <br />(Continued on Sheet No. 9:0j1 <br />U00 br. &K ftola%k�0* <br />,10*tIve: Septemberr"* <br />2- 3 - 22� <br />
The URL can be used to link to this page
Your browser does not support the video tag.