Laserfiche WebLink
JonesEdmundsl <br />Integrity • Knowledge • Service <br />August 23, 2024 <br />Ronnie Jones, BSCE, A.M. ASCE <br />Assistant Managing Director <br />Indian River County — Solid Waste Disposal District <br />1325 741h Avenue SW <br />Vero Beach, Florida 32968 <br />rjones0)indianriver.gov <br />RE: 741h Avenue SW Street Roadway Turn Lane Improvements <br />Indian River County Solid Waste Disposal District <br />Scope of Services and Fee Schedule <br />Jones Edmunds Opportunity No.: 95479-189-24 <br />Dear Mr. ]ones: <br />Jones Edmunds appreciates this opportunity to provide professional engineering services for <br />design, permitting, and bidding services for entry roadway widening including a new second <br />turn lane that connects to a dedicated Automated Scale Lane off 741h Avenue SW Street into <br />the Solid Waste Disposal District (SWDD) facilities. This turn lane work will include widening <br />the entrance and connecting the entrance drive into the Automated Scale Lane under <br />construction at the scale house. The existing entrance gate will be replaced with a wider <br />gate. A camera or licensed plate reader will be added to the new gate. <br />The existing pavement section for 74th Avenue SW Street is a rural section with a dirt <br />shoulder and open drainage ditch that will be modified with the new turn lane. <br />The project goal is to enable commercial hauler traffic to directly access the Automated <br />Scale Lane, bypass the scale house, and not interfere with the residential waste disposal <br />trucks, thereby reducing the traffic at the scale house. <br />Project design elements include: <br />■ Design a second dedicated roadway right turn lane into the SWDD facility. <br />■ Coordinate with existing utilities for relocating existing utilities that are impacted by the <br />new road work. <br />■ Coordinate and design the extension of the existing culvert under 74th Avenue SW Street <br />with the Indian River Farms Water Control District. <br />• Realign and widen the main entrance into the facility. <br />• Address utilities that can be abandoned or capped. <br />■ Delineate wetlands or habitat species impacted by road work. <br />• Prepare project specifications using the 16 -Division Master Specification format (see <br />attached for an example specification list). Division 2, Site Construction, will be the main <br />800.237.1053 1 JONESEDMUNDS.COM <br />