My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-262
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 2:07:51 PM
Creation date
11/6/2024 1:41:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/08/2024
Control Number
2024-262
Agenda Item Number
8.N.
Entity Name
Kimley Horn & Associates, Inc.
Subject
Kimley Horn & Associates, Inc. Amendment 1 for Work Oder No. 8 for Floridian Aquifer Well S-1
Replacement; IRCDUS Proj. ID: 11.22.503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydrogeologic Services Estimate <br />PROJECT: Upper Floridan Aquifer Well S-111, Well Design, Bidding, Construction & Testing - 24 Hr Drilling Update SHEET 1 OF 1 <br />CLIENT: Kimley-Horn/Indian River County FILE NO. <br />ESTIMATOR: Jon Friedrichs, P.G., JLA Geosciences DATE: 07/29/24 <br />JLA Geosciences, Inc. <br />DESCRIPTION: <br />Provide hydrogeologic services for the well design, <br />construction phase services, and well completion reporting <br />for one 1 U Prot <br />( ) Upper Floridan Aquifer Production Well (S-4). Manager- <br />Pres <br />Prin Sr. Sr. <br />Hydro Hydro III Hydro I <br />Hydro <br />II <br />MAN HOURS/EXPENSES <br />Hydro Tech. ODC/ <br />I Admin. Subcontr. <br />Equipment <br />Costs/ <br />Mileage <br />LINE TOTAL <br />TASK TOTAL <br />NO. TASK <br />4.0 Upper Floridan Aquifer Well Construction <br />$52,217 <br />Drill pilot hole to penetrate Floridan aquifer; geophysical <br />logging pilot borehole <br />(6 Days) <br />4 <br />42 <br />42 <br />$332 <br />$12,857.70 <br />Caliper Log, Install and grout PVC well casing (7 Days) <br />6 <br />57 <br />57 <br />$199 <br />$17,386.02 <br />Reverse air drill to total depth, water quality sampling, <br />flow testing, geophysical logging pilot borehole (9 Days) <br />9 <br />70 <br />70 <br />$332 <br />$21,973.70 <br />TOTAL HOURS <br />19 <br />169 <br />169 <br />862 <br />52217 <br />LABOR ($/HOUR) 249 <br />328 214 162 <br />139 <br />128 92 <br />TOTALS1 <br />6232 <br />23491 21632 <br />$862.42 <br />$52,2171 <br />$52,2171 <br />Hydrogeological &a Est UFA St ConstruclionTesting_24 hr rev2.xIm 7/2912024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.