Laserfiche WebLink
Proposal Pricing Form RFP 202500 <br />Item No. <br />Unit <br />Material Unit <br />Price (Furnish <br />only) <br />Unit Price to <br />Install only <br />Total Unit Price <br />(Furnish + <br />Installation) <br />(k) 24 -inch <br />LF <br />$ 381.62 <br />$ 93.38 <br />$ <br />475.00 <br />A48 <br />Steel casing <br />(a) Asphalt Road <br />(a) 4 -inch <br />LF <br />$ 23.05 <br />$ 18.95 <br />$ <br />42.00 <br />159.00 <br />(b) 6 -inch <br />LF <br />$ 29.63 <br />$ 20.37 <br />$ <br />50.00 <br />79.94 <br />(c) 8 -inch <br />LF <br />$ 46.10 <br />$ 23.40 <br />$ <br />69.50 <br />16.53 <br />(d) 10 -inch <br />LF <br />$ 57.62 <br />$ 25.88 <br />$ <br />83.50 <br />SY <br />(e) 12 -inch <br />LF <br />$ 62.55 <br />$ 29.45 <br />$ <br />92.00 <br />(f) 14 -inch <br />LF <br />$ 64.20 <br />$ 29.80 <br />$ <br />94.00 <br />$ <br />(g) 16 -inch <br />LF <br />$ 74.08 <br />$ 31.92 <br />$ <br />106.00 <br />$ <br />(h) 18 -inch <br />LF <br />$ 79.02 <br />$ 32.98 <br />$ <br />112.00 <br />$ <br />(i) 20 -inch <br />LF <br />$ 90.58 <br />$ 35.42 <br />$ <br />126.00 <br />(h) Concrete Sidewalk (4") <br />(j) 22 -inch <br />LF <br />$ 128.40 <br />$ 42.60 <br />$ <br />171.00 <br />228.00 <br />(k) 24 -inch <br />LF <br />$ 115.23 <br />$ 39.77 <br />$ <br />155.00 <br />SECTION <br />B -Restoration <br />61 <br />Pavement Repair and Replacement <br />(a) Asphalt Road <br />SY <br />$ <br />- <br />$ <br />159.00 <br />$ <br />159.00 <br />(b) Asphalt Driveway <br />SY <br />$ <br />33.06 <br />$ <br />79.94 <br />$ <br />113.00 <br />(c) Asphalt Millings <br />SY <br />$ <br />16.53 <br />$ <br />21.47 <br />$ <br />38.00 <br />(d) Asphalt overlay <br />SY <br />$ <br />- <br />$ <br />30.00 <br />$ <br />30.00 <br />(e) Add. S-3 Asphalt <br />Ton <br />$ <br />$ <br />252.00 <br />$ <br />252.00 <br />(f) Cold Mix Asphalt <br />Ton <br />$ <br />- <br />$ <br />342.00 <br />$ <br />342.00 <br />(g) Concrete Driveway (6") <br />SY <br />$ <br />- <br />$ <br />228.00 <br />$ <br />228.00 <br />(h) Concrete Sidewalk (4") <br />SY <br />$ <br />- <br />$ <br />228.00 <br />$ <br />228.00 <br />(i) Concrete Curb <br />1. Curb and Gutter <br />LF <br />$ <br />$ <br />113.00 <br />$ <br />113.00 <br />2.'D'Curb <br />LF <br />$ <br />$ <br />107.00 <br />$ <br />107.00 <br />(j)Thermoplastic Striping (Yellow) FDOT Spec. <br />LF <br />$ <br />$ <br />6.00 <br />$ <br />6.00 <br />(k)Thermoplastic Striping (White) FDOT Spec. <br />LF <br />$ <br />- <br />$ <br />6.00 <br />$ <br />6.00 <br />(I)Concrete Driveway Paver Block <br />SY <br />$ <br />- <br />$ <br />289.00 <br />$ <br />289.00 <br />(m) Lime rock Driveway <br />SY <br />$ <br />33.06 <br />$ <br />27.44 <br />$ <br />60.50 <br />(n) Asphalt sidewalk <br />SY <br />$ <br />- <br />$ <br />121.00 <br />$ <br />121.00 <br />132 <br />Milling Asphalt <br />SY <br />$ <br />- <br />$ <br />30.00 <br />$ <br />30.00 <br />63 <br />Coquina Rock Base <br />CY <br />$ <br />26.75 <br />$ <br />5.25 <br />$ <br />32.00 <br />64 <br />Flowable Fill <br />(a) 0 - 4 cy (include short load fees) <br />CY <br />$ <br />321.00 <br />$ <br />64.00 <br />$ <br />385.00 <br />(b) 4 - 8 cy (include short load fees) <br />CY <br />$ <br />321.00 <br />$ <br />64.00 <br />$ <br />385.00 <br />