Proposal Pricing Form RFP 202500
<br />Item No.
<br />Unit
<br />Material Unit
<br />Price (Furnish
<br />only)
<br />Unit Price to
<br />Install only
<br />Total Unit Price
<br />(Furnish +
<br />Installation)
<br />(d) 6' -Over (double)
<br />EA
<br />$
<br />720.00
<br />$
<br />2,400.00
<br />$
<br />3,120.00
<br />A25
<br />6" Sanitary Sewer Services - Additional Footage
<br />(a) 0'-6'
<br />LF
<br />$
<br />10.00
<br />$
<br />65.00
<br />$
<br />75.00
<br />(b) 6' -Over
<br />LF
<br />$
<br />10.00
<br />$
<br />95.00
<br />$
<br />105.00
<br />A26
<br />Sanitary Sewer Services (constructed on existing sewer lines)
<br />(a) 0'-6' (single)
<br />EA
<br />$
<br />650.00
<br />$
<br />3,200.00
<br />$
<br />3,850.00
<br />(b) 0'-6' (double)
<br />EA
<br />$
<br />720.00
<br />$
<br />3,400.00
<br />$
<br />4,120.00
<br />(c) 6' -Over (single)
<br />EA
<br />$
<br />650.00
<br />$
<br />4,600.00
<br />$
<br />5,250.00
<br />(d) 6' -Over (double)
<br />EA
<br />$
<br />720.00
<br />$
<br />4,800.00
<br />$
<br />5,520.00
<br />A27
<br />Sanitary Sewer Cleanouts (to existing sanitary sewer laterals)
<br />(a) 0'-6' (4")
<br />EA
<br />$
<br />420.00
<br />$
<br />1,400.00
<br />$
<br />1,820.00
<br />(b) 6' -Over (4")
<br />EA
<br />$
<br />450.00
<br />$
<br />2,800.00
<br />$
<br />3,250.00
<br />(c) 0'-6' (6")
<br />EA
<br />$
<br />500.00
<br />$
<br />1,600.00
<br />$
<br />2,100.00
<br />(d) 6' -Over (6")
<br />EA
<br />$
<br />520.00
<br />$
<br />2,800.00
<br />$
<br />3,320.00
<br />A28
<br />Cleanout Ring and Cover (constructed on new or existing cleanouts)
<br />EA
<br />$
<br />210.00
<br />$
<br />460.00
<br />$
<br />670.00
<br />A29
<br />Water Services
<br />(a) 1 -inch (single short)
<br />EA
<br />$
<br />865.00
<br />$
<br />1,200.00
<br />$
<br />2,065.00
<br />(b) 1 -inch (single long)
<br />EA
<br />$
<br />965.00
<br />$
<br />1,800.00
<br />$
<br />2,765.00
<br />(c) 1 -inch (double short)
<br />EA
<br />$
<br />1,925.00
<br />$
<br />1,200.00
<br />$
<br />3,125.00
<br />(d)1 -inch (double long)
<br />EA
<br />$
<br />2,100.00
<br />$
<br />1,800.00
<br />$
<br />3,900.00
<br />(e) 2 -inch (single short)
<br />EA
<br />$
<br />2,250.00
<br />$
<br />1,200.00
<br />$
<br />3,450.00
<br />(f) 2 -inch (single long)
<br />EA
<br />$
<br />2,350.00
<br />$
<br />1,800.00
<br />$
<br />4,150.00
<br />(g) 2 -inch (double short)
<br />EA
<br />$
<br />2,650.00
<br />$
<br />1,400.00
<br />$
<br />4,050.00
<br />(h) 2 -inch (double long)
<br />EA
<br />$
<br />2,750.00
<br />$
<br />1,800.00
<br />$
<br />4,550.00
<br />A30
<br />Water Services - Horizontally Drilled
<br />(a) 1 -inch (single short)
<br />EA
<br />$
<br />865.00
<br />$
<br />1,400.00
<br />$
<br />2,265.00
<br />(b)1 -inch (single long)
<br />EA
<br />$
<br />965.00
<br />$
<br />3,150.00
<br />$
<br />4,115.00
<br />(c) 1 -inch (double short)
<br />EA
<br />$
<br />1,925.00
<br />$
<br />1,400.00
<br />$
<br />3,325.00
<br />(d) 1 -inch (double long)
<br />EA
<br />$
<br />2,100.00
<br />$
<br />3,150.00
<br />$
<br />5,250.00
<br />(e) 2 -inch (single short)
<br />EA
<br />$
<br />2,250.00
<br />$
<br />1,400.00
<br />$
<br />3,650.00
<br />(f) 2 -inch (single long)
<br />EA
<br />$
<br />2,350.00
<br />$
<br />3,300.00
<br />$
<br />5,650.00
<br />(g) 2 -inch (double short)
<br />EA
<br />$
<br />2,650.00
<br />$
<br />1,400.00
<br />$
<br />4,050.00
<br />(h) 2 -inch (double long)
<br />EA
<br />$
<br />2,750.00
<br />$
<br />3,300.00
<br />$
<br />6,050.00
<br />A31
<br />lWater Services Additional Footage
<br />(a) 1 -inch HDPE Water Service
<br />LF
<br />$
<br />10.00
<br />$
<br />32.00
<br />$
<br />42.00
<br />(b) 2 -inch HDPE Water Service
<br />LF
<br />$
<br />15.00
<br />$
<br />32.00
<br />$
<br />47.00
<br />A32
<br />Blow -off Assembly
<br />EA
<br />$
<br />1,400.00
<br />$
<br />1,400.00
<br />$
<br />2,800.00
<br />
|