My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-269A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-269A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:59:31 AM
Creation date
11/12/2024 11:56:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/22/2024
Control Number
2024-269A
Agenda Item Number
8.D
Entity Name
Johnson-Davis Incorporated
Subject
Continuing Contract Agreement for Annual Utility Labor Services
Document Relationships
2024-266
(Agenda)
Path:
\Official Documents\2020's\2024
2024-267
(Agenda)
Path:
\Official Documents\2020's\2024
2024-268
(Agenda)
Path:
\Official Documents\2020's\2024
2024-269
(Agenda)
Path:
\Official Documents\2020's\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Pricing Form RFP 202500 <br />On#& Company Name: Johnson -Davis Incorporated <br />Item No. <br />Unit <br />Material Unit <br />Price (Furnish <br />only) <br />Unit Price to <br />Install only <br />Total Unit Price <br />(Furnish + <br />Installation) <br />SECTION A <br />Al <br />Mobilization <br />a) Emergency Event <br />EA <br />$ <br />4,000.00 ' <br />(b) Non - Emergency Event <br />EA <br />$ <br />5,000.00 <br />(c)100% Public Construction Bond - percent of project price <br />% <br />2.00%o,, <br />(d) Confined Space Entry Compliance (per site) <br />LS <br />$ <br />500.00 <br />(e) Cost of Compliance with trench safety standards <br />LF <br />$ <br />5.00 <br />(f) Cost of Compliance with trench special shoring requirements <br />SF <br />$ <br />20.00 <br />A2 <br />Traffic Control/NPDS compliance <br />(a) Residential Street <br />LF <br />$ <br />3.00 <br />F, <br />(b) Arterial Roadway <br />LF <br />$ <br />4.00_w� <br />(c) FDOT Roadway <br />(d) Erosion Control/BMP <br />LF <br />LF <br />$ <br />$ <br />5.00 <br />5.00 <br />A3 <br />Video Documentation <br />(a) Pre -Construction <br />LF <br />$ <br />3.00 <br />A4 <br />(b) Post -Construction Video <br />Water Main - PVC <br />LF <br />$ <br />3.00 <br />� <br />(a) 2 -inch <br />LF <br />$ <br />3.00 <br />$ <br />27.00 <br />$ <br />30.00 <br />(b) 4 -inch <br />LF <br />$ <br />9.00 <br />$ <br />36.00 <br />$ <br />45.00 <br />(c) 6 -inch <br />LF <br />$ <br />20.00 <br />$ <br />35.00 <br />$ <br />55.00 <br />(d) 8 -inch <br />LF <br />$ <br />34.00 <br />$ <br />36.00 <br />$ <br />70.00 <br />(e) 10 -inch <br />LF <br />$ <br />50.00 <br />$ <br />50.00 <br />$ <br />100.00 <br />(f) 12 -inch <br />LF <br />$ <br />75.00 <br />$ <br />50.00 <br />$ <br />125.00 <br />(g) 16 -inch <br />LF <br />$ <br />140.00 <br />$ <br />60.00 <br />$ <br />200.00 <br />(h) 18 -inch <br />LF <br />$ <br />190.00 <br />$ <br />60.00 <br />$ <br />250.00 <br />(i) 20 -inch <br />LF <br />$ <br />260.00 <br />$ <br />60.00 <br />$ <br />320.00 <br />(j) 24 -inch <br />LF <br />$ <br />300.00 <br />$ <br />60.00 1 <br />$ <br />360.00 <br />A5 <br />Water Main - DIP Cement Lined Interior for Water Mains <br />(a) 4 -inch <br />LF <br />$ <br />50.00 <br />$ <br />40.00 <br />$ <br />90.00 <br />(b) 6 -inch <br />LF <br />$ <br />35.00 <br />$ <br />40.00 <br />$ <br />75.00 <br />(c) 8 -inch <br />LF <br />$ <br />45.00 <br />$ <br />45.00 <br />$ <br />90.00 <br />(d) 10 -inch <br />LF <br />$ <br />60.00 <br />$ <br />60.00 <br />$ <br />120.00 <br />(e) 12 -inch <br />LF <br />$ <br />70.00 <br />$ <br />60.00 <br />$ <br />130.00 <br />(f) 16 -inch <br />LF <br />$ <br />140.00 <br />$ <br />75.00 <br />$ <br />215.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.