Laserfiche WebLink
Proposal Pricing Form RFP 202500 <br />Item No. <br />Unit <br />Material Unit <br />Price (Furnish <br />only) <br />Unit Price to <br />Install only <br />Total Unit Price <br />(Furnish + <br />Installation) <br />(k) 24 -inch <br />LF <br />$ 180.00 <br />$ 120.00 <br />$ <br />300.00- <br />A48 Steel casing <br />(a) 4 -inch <br />LF <br />$ 15.00 <br />$ 25.00 <br />$ <br />40.00 <br />(b) 6 -inch <br />LF <br />$ 35.00 <br />$ 40.00 <br />$ <br />75.00 <br />(c) 8 -inch <br />LF <br />$ 45.00 <br />$ 55.00 <br />$ <br />100.00 <br />(d) 10 -inch <br />LF <br />$ 80.00 <br />$ 80.00 <br />$ <br />160.00 <br />(e) 12 -inch <br />LF <br />$ 100.00 <br />$ 100.00 <br />$ <br />200.00 <br />(f) 14 -inch <br />LF <br />$ 130.00 <br />$ 120.00 <br />$ <br />250.00 <br />(g) 16 -inch <br />LF <br />$ 150.00 <br />$ 125.00 <br />$ <br />275.00 <br />(h) 18 -inch <br />LF <br />$ 170.00 <br />$ 140.00 <br />$ <br />310.00 <br />(i) 20 -inch <br />LF <br />$ 180.00 <br />$ 180.00 <br />$ <br />360.00 <br />(j) 22 -inch <br />LF -j_jL <br />180.00 <br />$ 180.00 <br />$ <br />360.00 <br />(k) 24 -inch <br />LF <br />1 $ 200.00 <br />$ 200.00 <br />$ <br />400.00 <br />SECTION B - Restoration <br />B1 <br />Pavement Repair and Replacement <br />(a) Asphalt Road <br />SY <br />$ <br />35.00 <br />$ <br />55.00 <br />$ <br />90.00 <br />(b) Asphalt Driveway <br />SY <br />$ <br />30.00 <br />$ <br />55.00 <br />$ <br />85.00 <br />(c) Asphalt Millings <br />SY <br />$ <br />10.00 <br />$ <br />15.00 <br />$ <br />25.00 <br />(d) Asphalt overlay <br />SY <br />$ <br />8.00 <br />$ <br />12.00 <br />$ <br />20.00 <br />(e) Add. S-3 Asphalt <br />Ton <br />$ <br />100.00 <br />$ <br />250.00 <br />$ <br />350.00 <br />(f) Cold Mix Asphalt <br />Ton <br />$ <br />130.00 <br />$ <br />120.00 <br />$ <br />250.00 <br />(g) Concrete Driveway (6") <br />SY <br />$ <br />55.00 <br />$ <br />60.00 <br />$ <br />115.00 <br />(h) Concrete Sidewalk (4") <br />SY <br />$ <br />40.00 <br />$ <br />60.00 <br />$ <br />100.00 <br />(i) Concrete Curb <br />1. Curb and Gutter <br />LF <br />$ <br />20.00 <br />$ <br />70.00 <br />$ <br />90.00 <br />2.'D' Curb <br />LF <br />$ <br />15.00 <br />$ <br />70.00 <br />$ <br />85.00 <br />(j)Thermoplastic Striping (Yellow) FDOT Spec. <br />LF <br />$ <br />3.00 <br />$ <br />5.00 <br />$ <br />8.00 <br />(k)Thermoplastic Striping (White) FDOT Spec. <br />LF <br />$ <br />3.00 <br />$ <br />5.00 <br />$ <br />8.00 <br />(I)Concrete Driveway Paver Block <br />SY <br />$ <br />30.00 <br />$ <br />90.00 <br />$ <br />120.00 <br />(m) Lime rock Driveway <br />SY <br />$ <br />16.00 <br />$ <br />24.00 <br />$ <br />40.00 <br />(n) Asphalt sidewalk <br />SY <br />$ <br />30.00 <br />$ <br />60.00 <br />$ <br />90.00 <br />B2 <br />Milling Asphalt <br />SY <br />$ <br />28.00 <br />$ <br />28.00 <br />B3 <br />Coquina Rock Base <br />CY <br />$ <br />15.00 <br />$ <br />15.00 <br />$ <br />30.00 <br />B4 <br />Flowable Fill <br />(a) 0 - 4 cy (include short load fees) <br />CY <br />$ <br />260.00 <br />$ <br />40.00 1 <br />$ <br />300.00 <br />