My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2024
CBCC
>
Meetings
>
2020's
>
2024
>
11/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 3:12:01 PM
Creation date
11/12/2024 3:05:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Special Call Meeting
Document Type
Agenda Packet
Meeting Date
11/24/2024
Meeting Body
Board of County Commissioners
Subject
EAR Comprehensive Plan Evaluatin and Appraisal Report Kimley Horn
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~ a requirement that a national pollutant discharge elimination system (NPDES) pollution prevention plans addressing <br />wind and water erosion be depicted on mining site plans and approved by County engineering staff prior to Planning and <br />Zoning Commission review; <br />~ a requirement that baseline water quality data be collected at project outfall points; <br />~ a requirement that applicants monitor discharge at outfall points to ensure no increase in levels of turbidity at outfall <br />points and compliance with state and federal water quality standards; and <br />~ a requirement of comprehensive dust and spillage control plans as part of mining site plans. <br />Policy 9.3: The county shall support the City of Sebastian's efforts to preserve and reestablish working waterfronts in <br />Sebastian by seeking grants to restore the Archie Smith Fish House to a demonstration working waterfront. [Structure <br />Removed based on available records] <br />Objective 10: Through 2025, there will be no adverse off-site soil erosion impacts associated with land development <br />and agricultural activities, and beach shoreline systems will be stabilized. <br />Policy 10.3: The cCounty shall undertake beach shoreline stabilization activities including continue to implement the <br />Beach Preservation Plan (BPP) including beach shoreline stabilization and conduct updates at least every five years for <br />the following activities: <br />~ monitoring of the experimental Pre-fabricated Erosion Protection ("PEP") reef to determine the need for <br />supplemental beach stabilization, such as sand renourishment; <br />~ determining additional funding sources for public beach stabilization projects, including consideration of <br />establishing a beach taxing district. The County should also continue to use the Tourist Development Tax and the Local <br />Option Sales Tax to match State funds for financing future Indian River County beach projects, <br />~ coordinating with the Sebastian Inlet Tax District and the City of Vero Beach on beach restoration projects; and <br />~ continuing meetings of a beach preservation and restoration advisory committee concerning recommendations <br />unrelated issues. <br />PAGE 106
The URL can be used to link to this page
Your browser does not support the video tag.