Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Policy 2.2: By 20122040, all drainage basins within the cCounty shall meet a 10 year /24-hour storm event level-of- <br />service standard. <br />Policy 2.4: The cCounty shall require all new development sites to be designed with stormwater management retention <br />systems capable of water quality treatment equal to accommodating 1.25 times the impervious surface area, or 01.5 <br />inches times the project area, or greater as may be required by SJRWMD. <br />Policy 2.5: By 2012, the county will adopt a Stormwater Master Plan. In developing the Stormwater Master Plan, the <br />county will analyze each basin in the unincorporated county, identify existing conditions and problems in each basin, and <br />identify projected growth in each basin. As a result of that analysis, the county will identify a design storm parameter, <br />discharge rate, land use allowance, and structural improvement plan for each basin. The county will coordinate with the <br />City of Sebastian and will prioritize analysis of the areas within and adjacent to the St. Sebastian River basin. <br />Policy 2.6: To ensure stormwater management facilities function properly, the cCounty will continuously evaluate and <br />adjust established defined levels of maintenance practices for public and private stormwater management facilities and <br />will conduct inspections on a routine basis. <br />Policy 2.9: By 20122027, the cCounty will conduct a comprehensive inventory of all stormwater management facilities in <br />all of the drainage sub-basins under the county's jurisdiction. <br />Policy 2.10: By 20122030, the cCounty shall establish a Geographic Information System (G.I.S.)-based inventory of all <br />stormwater management facilities under the county's jurisdiction. <br />Objective 3: By 2012, Indian River County will have an adopted Stormwater Master Plan, which will guide all incorporate <br />all improvements to publicly maintained stormwater management facilities in Indian River County over a 20-year time <br />frame in the Capital Improvement Plan. <br />Policy 3.1: By 2027, Indian River County, Indian River County will complete a stormwater Master Plan, which will guide <br />all improvements to stormwaterStorm water Mmanagement Ffacilitiesy Improvements shall be included within the Indian <br />River County Infrastructure CIP. A 20 Year Improvement Program for storm water management facilities will be included <br />as part of the Indian River County Stormwater Master Plan, once adopted. <br />Policy 3.4: By 203012, With the Stormwater Master Plan, the cCounty shall consider establishing a stormwater utility to <br />fund maintenance and improvements of existing stormwater management facilities. <br />PAGE 60