Laserfiche WebLink
Alt Form 525-010-60eB STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525 -011 -OB <br />STATE -FUNDED GRANT AGREEMENT PROGRAM <br />MANAGEMENT <br />8/21 <br />Page 1 of 1 <br />EXHIBIT B <br />SCHEDULE OF FINANCIAL ASSISTANCE <br />RECIPIENT NAME & BILLING ADDRESS: <br />FINANCIAL PROJECT NUMBER: <br />Indian River County <br />444269-1-54-01 <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />MAXIMUM PARTICIPATION <br />(1) <br />TOTAL PROJECT FUNDS <br />(2) <br />LOCALFUNDS <br />(3) <br />STATE FUNDS <br />Indicate source of <br />PHASE OF WORK by Fiscal Year: <br />Local funds <br />Design- Phase 34 Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Design Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Right -of -Way- Phase 44Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Right -of -Way Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Construction- Phase 54 Maximum Department Participation <br />$7,554,423.00 <br />$6,008,142.00 <br />$1,546,281.00 <br />❑ In -Kind <br />FY: 2025 (Small County Outreach Program <br />® Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Construction Cost <br />$7,554,423.00 <br />$6,008,142.00 <br />$1,546,281.00 <br />Construction Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />Engineering and (Insert Program Name) <br />❑ Cash <br />Inspection - Phase 64 <br />FY: <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Construction Engineering and Inspection Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />(Phase : ) Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total "" ' Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />TOTAL COST OF THE PROJECT <br />$7,554,423.00 <br />$6,008,142.00 <br />$1,546,281.00 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Jason Nwamah <br />District Grant Manager Name <br />Signature Date <br />