My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-282
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:41:40 AM
Creation date
12/19/2024 10:38:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/05/2024
Control Number
2024-282
Agenda Item Number
8.Q.
Entity Name
GRSC, Inc.
Subject
Section 00520 Agreement for South County Regional Park Improvements 800 20th Avenue SW
Project Number
2025011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and GRSC, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in <br />consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project includes installation of a new pavilion, outdoor fitness area and <br />equipment, pedestrian loop, and drinking water fountain, complete with associated <br />Potable water service. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: South County Regional Park Improvements <br />Bid Number: 2025011 <br />Project Address: 800 20th Avenue SW, Vero Beach, FL 32962 <br />ARTICLE 3 - ENGINEER <br />3.01 Masteller & Moler, Inc. is hereinafter called the ENGINEER and will act as OWNER's <br />representative, assume all duties and responsibilities, and have the rights and authority <br />assigned to ENGINEER in the Contract Documents in connection with the completion of the <br />Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 180th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 240th calendar day after the date when the <br />Contract Times commence to run. <br />4.03 Liquidated Damages <br />
The URL can be used to link to this page
Your browser does not support the video tag.