My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-289
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:48:00 AM
Creation date
12/19/2024 10:44:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/05/2024
Control Number
2024-289
Agenda Item Number
15.B.2.
Entity Name
SCS Field Services
Subject
Agreement for Landfill Gas Wellfield Expansion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. Contractor will in disclose any potential delays to the Work, as soon as Contractor becomes <br />aware. Contractor, Engineer, and Owner will determine appropriate measures, which may <br />include changes to Contract Times and/or Cost, which will be reflected as a Change Order <br />or Written Amendment to the Agreement. <br />ARTICLE 7 - CONTRACT DOCUMENTS <br />7.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement; <br />2. Public Construction Bond; <br />3. Certificate(s) of Liability Insurance; <br />4. CONTRACTOR'S Proposal dated June 21, 2024, with Subject "Proposal to Install Landfill <br />Gas Flare Station Equipment and Process Piping Revision One"; <br />5. Drawings and Specifications Prepared by Biogas Engineering, bearing the general title <br />"Landfill Gas Blower Skid & Flare Replacement, and numbered or identified as follows: <br />G445A-D, inclusive; C445A-I, inclusive; S445A-F, inclusive; P445A-L, inclusive; <br />M445A-Z, and M445AA-AM, inclusive; 63 Piping Isometric Plan Sheets; E -445B -K, <br />inclusive; and, J445A-B, inclusive. <br />6. Indian River County Site Plan Approval <br />7. Florida Department of Environmental Protection Air Permit <br />8. Contractor's Application for Payment <br />9. Contractor's Final Certification of the Work <br />io. The following which may be delivered or issued on or after the Effective Date of the <br />Agreement and are not attached hereto: <br />a) Written Amendments <br />b) Change Orders <br />B. In the event of conflict between Contract Documents, the order of prevalence shall be: <br />i. This Agreement and any Written Amendments and Change'Orders thereto <br />2. Drawings and Specifications Prepared by Biogas Engineering <br />3. CONTRACTOR'S Proposal Dated June 21, 2024 <br />ARTICLE 8 - MISCELLANEOUS <br />8.oi Terms <br />A. SWDD Managing Director or Designee shall refer to OWNER's Employees. <br />8.02 Assignment of Contract <br />A. No assignment by a parry hereto of any rights under or interests in the Agreement will be <br />binding on another party hereto without the written consent of the parry sought to be bound; <br />and, specifically but without limitation, moneys that may become due and moneys that are <br />due may not be assigned without such consent (except to the extent that the effect of this <br />restriction may be limited by law), and unless specifically stated to the contrary in any <br />written consent to an assignment, no assignment will release or discharge the assignor from <br />any duty or responsibility under the Contract Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.