My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-293
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:54:09 AM
Creation date
12/19/2024 10:52:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/19/2024
Control Number
2024-293
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting, Inc
Subject
. Section 00520 Agreement (Public Works) for 43rd Avenue Bicycle and Pedestrian
Improvements 14th Lane and 15th Place Resurfacing
Project Number
2025008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Government Prompt Payment Act. In such event, payment and retainage provisions shall <br />be governed by the applicable grant requirements and guidelines. <br />6.05 Acceptance of Final Payment as Release. <br />A. The acceptance by the CONTRACTOR of final payment shall be and shall operate <br />as a release to the OWNER from all claims and all liability to the CONTRACTOR <br />other than claims in stated amounts as may be specifically excepted by the <br />CONTRACTOR for all things done or furnished in connection with the work under <br />this Contract and for every act and neglect of the OWNER and others relating to <br />or arising out of the work. Any payment, however, final or otherwise, shall not <br />release the CONTRACTOR or its sureties from any obligations under the Contract <br />Documents or the Public Construction Bond. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents, and the other <br />related data identified in the Bidding Documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface <br />conditions at or contiguous to the Site and all drawings of physical conditions in or relating <br />to existing surface or subsurface structures at or contiguous to the Site (except Underground <br />Facilities) which have been identified in the Supplementary Conditions as provided in <br />paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous <br />Environmental Condition, if any, at the Site which have been identified in the Supplementary <br />Conditions as provided in paragraph 4.06 of the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all additional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities) <br />Agreement (Public Works) REV 04-07 - 00520 - 5 <br />F:\Purchasing\Bids\2024-2025 FY (2025000)\2025008 14th Lane & 15 Place Resurfacing\SECTION 00520 Agreement.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.