My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-308
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2024 1:04:00 PM
Creation date
12/30/2024 1:02:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/03/2024
Control Number
2024-308
Agenda Item Number
9.V.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order No. 15 for 8th Street Reconstruction from 66th Avenue to 82nd Avenue;
Project Number
IRC-2316
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. XX <br />811 Street Roadway <br />Improvements — 6611 Avenue <br />to 82nd Avenue <br />EXHIBIT A — SCOPE OF WORK <br />The County desires to improve 811 Street to a 2 -lane rural roadway with paved shoulders <br />between 66th Avenue and 82nd Avenue, approximately 10,560 linear feet. A 10' wide multi -use <br />path along the northern right of way limit will be planned to be integrated into the overall <br />design. The existing right-of-way varies in width between 60 to 95 ft. It is anticipated that <br />either right-of-way acquisition or alternative roadway sections will need to be developed to <br />complete the improvement corridor. <br />The County owns a parcel in the southeast quadrant of the 8th Street/74th Avenue intersection. <br />This parcel will be evaluated for the purpose of providing a stormwater management facility to <br />serve the roadway improvements. <br />A. Topographic Design Survey: <br />The Consultant will provide topographic design survey services necessary to support and <br />facilitate contemplated design and permitting activities associated with this project. This <br />task will consist of the preparation of digital base map topographic surveys in accordance <br />with the Standards of Practice, established by the Board of Professional Surveyors and <br />Mappers, Chapter 5J-17, Florida Administrative Codes, pursuant to current Section 472.027, <br />Florida Statutes, per 5J-17.050 through 5J-17.052. The survey will include: <br />The survey will include: <br />1. Establishment of a project wide Horizontal Control Network within the PROJECT LIMITS. <br />A Design Survey Baseline will be established and monumented. A minimum of five <br />Design Survey Baseline monuments will be installed. <br />2. Establishment of a project wide Vertical Control Network within the PROJECT LIMITS. All <br />elevations will be referenced to NAVD 1988 datum. <br />The limits of the topographic design survey are as follows: <br />81h Street - between 66th Avenue and 82nd Avenue, approximately 10,560 linear feet. <br />Topographic survey shall extend no less than 20 feet beyond the right-of- <br />way. <br />B. Geotechnical Investigation: <br />The Consultant will retain the services of a Geotechnical sub -consultant to assist in <br />evaluating the existing soil and roadway pavement conditions. The Geotechnical sub - <br />consultant will provide the following Geotechnical Services: <br />Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.