My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-308
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2024 1:04:00 PM
Creation date
12/30/2024 1:02:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/03/2024
Control Number
2024-308
Agenda Item Number
9.V.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order No. 15 for 8th Street Reconstruction from 66th Avenue to 82nd Avenue;
Project Number
IRC-2316
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. XX <br />81" Street Roadway <br />Improvements — 661" Avenue <br />to 82nd Avenue <br />centerline of construction. Horizontal control points with state plane <br />coordinates for all PC's, PT's, curve radius, curve length and horizontal Pi's shall <br />be included on the Plan or summarized in an alignment table. <br />4. Plans shall include spot grades adequate to describe any proposed grading. <br />5. Match lines shall not be located within the limits of an intersection. <br />6. All quantities shall reference FDOT Pay Item Numbers. <br />7. All details shall reference FDOT Index Numbers. <br />8. All specifications shall reference to FDOT Specifications for Road and Bridge <br />Construction. Any deviations are special specifications not included in FDOT <br />Specifications are required in the Technical Specifications. <br />9. Initial (30% completion), preliminary (60% completion), interim (90% <br />completion) and Final Plan (100% completion) Submittal shall include the <br />following: <br />i. One (1) set of drawings in PDF format. <br />ii. One (1) Opinion of Probable Construction Cost <br />The plans will be prepared based upon English units. Final design files will be submitted in <br />AutoCAD format. <br />D. Signing and Pavement Marking Plans: <br />Signing and Pavement Markings will be included within the Roadway Plan set. Quantities <br />will be provided in the Summary of Pay Items sheet. All signing and pavement markings are <br />to be prepared in accordance with the latest design standards and practices (MUTCD), FDOT <br />Standard Specifications, Indexes, and shall be accurate, legible, and complete in design. <br />E. Drainage Design: <br />The Consultant will perform drainage investigations and analysis necessary to prepare a <br />design which will drain the project in accordance with Indian River County, St. Johns River <br />Water Management District (SJRWMD) and Indian River Farms Water Control District <br />(IRFWCD) design criteria. The Consultant will assist the County with the submittal of the <br />permit applications, coordination and supporting documentation for the project to the <br />following agencies: <br />• Indian River County Public Works <br />• St. Johns River Water Management District <br />• Indian River Farms Water Control District <br />Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.