My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-273
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 10:27:07 AM
Creation date
1/7/2025 10:23:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/22/2024
Control Number
2024-273
Agenda Item Number
8.H.
Entity Name
Edlund, Dritenbas, , Brinkley Architects and Associates, P.A.
Subject
Architecture Services Work Order 2 for Fire Station 15 Design
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=' <br />1n <br />Mr. John Binkley <br />October 7, 2024 <br />Page 2 <br />Proposal: 24-0399 <br />2. Depict all easements/ right of ways shown on Record Plat or known to surveyor. <br />3. Depict current flood zone lines, if applicable. <br />4. Project scope area for topographic and tree survey to commence at the southwest comer of <br />87th Street and 91' Avenue and extend north approximately 500 feet and easterly to the <br />west edge of the existing retention pond. <br />5. Topographic survey, minimum 50 -foot grid within project scope area. <br />6. LiDAR scanning for enhanced elevation saturation and mapping within project scope area. <br />7. Locate desirable trees 8" dbh and above within project scope area. <br />8. Locate visible above ground utilities with elevations where applicable within project scope <br />area. <br />9. Locate and depict visible sanitary sewer force main markers at the intersection of CR 510 <br />and 87th Street. <br />10. Locate and depict visible water main markers along 87th Street between 91St Avenue and <br />CR 510. <br />11. Locate existing drainage structures including rim elevation, pipe invert, size, type and <br />direction within project scope area. <br />12. Locate and depict west edge of retention pond on adjacent parcel via top of bank and top <br />of water elevations within project scope area. <br />13. Provide sufficient elevations on site to determine existing drainage patterns. <br />14. Provide 6 certified copies of the completed survey, including all the above. <br />15. Provide a PDF copy of the survey, upon request <br />Task 2 — Environmental Consulting Services (ENV -1) <br />1. Environmental Impact Report <br />a. Flora and Fauna Study <br />b. Soils Study <br />C. Hydrology Study <br />d. Wetland Determination <br />e. Other Surface Water Determination <br />f. Protected Species Determination <br />g. GIS Mapping by Aerial Interpretation and Ground Truthing <br />h. PDF file of the completed report <br />2. Gopher Tortoise 100% Suitable Habitat Survey <br />a. Burrow Flagging and Location <br />b. GIS Mapping of all burrows <br />C. Population Estimate <br />d. Relocation Estimate (if applicable) <br />e. Gopher Tortoise Survey Update within 90 days prior to commencement <br />
The URL can be used to link to this page
Your browser does not support the video tag.