Laserfiche WebLink
CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAME: JACKIE ROBINSON TRAINING CENTER WALKING TRAIL <br />PROJECT NO. IRC -1908 BID NO. 2023041 <br />item No.Description <br />Unit <br />Quantity <br />Unit Price <br />Price Increase <br />Price Decrease <br />334-1-53A <br />SUPERPAVE APHALTIC CONCRETE, LEVELING COURSE <br />TN <br />74 <br />316.90 <br />23,558.35 <br />436-1-1 <br />]To <br />TRENCH DRAIN, BEHIND BRIDGE SUPPORT <br />LF <br />30 <br />135.00 <br />4,050.00 <br />WCD1 <br />RELOCATE EXISTING FIRE HYDRANT <br />LS <br />1 <br />6,496. 11 <br />6.496411 <br />WCD3 <br />remove galvanized finish from original bridge scope and replace wit t <br />LS <br />1 <br />12,695.55 <br />12,695.55 <br />WCD4 <br />Added materials striping, signage to entry & thermos to HIC Stalls. Re r <br />LS <br />1 <br />5,071.53 <br />5,071 53 <br />334 -1-53B <br />SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C (TYPE SP - <br />12.5, 76-22, 1.5-) <br />TN <br />133 <br />289.65 <br />38 523.45 <br />WCD5 <br />To remove bridge charges paid by IRC to Bridge Brothers, Inc. to <br />ensure delivery of bridge on 7/29/2024 <br />LS <br />1 <br />336,791.00 <br />336 791.00 <br />WCD6 <br />To charge for Bridge Brothers Invoice for Change Order No. 1 to <br />correct placement of anchors/nuts & washers previously installed by <br />Prince Land subcontractor <br />LS <br />1.00 <br />10,74538 <br />10,745.38 <br />Roundinq <br />LS <br />1.00 <br />0.01 <br />0.01 <br />344 -FA <br />FORCE ACCOUNT <br />LS <br />1 <br />100,000.00 <br />100,000.00 <br />ISUBTOTALS� <br />51,871.54 <br />485,059.84 <br />JACKIE ROBINSON TRAINING CENTER WALKING TRAIL TOTAL <br />$ (434,188.30) <br />I <br />FVAblic Woft%ENGINEERING DMWN PROJECTS1908 Jackie R0bk%WTCWa§*V TraA14AffkAAqwda Owm1Oroj Cb"ouNRG19"_C0I_20241217 <br />