My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-322
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 3:57:49 PM
Creation date
1/7/2025 3:56:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/17/2024
Control Number
2024-322
Agenda Item Number
9.L.
Entity Name
Southeast Services of the Treasure Coast, Inc
Subject
Section 00942 Change Order No. 1 for CR512 & N. Broadway Street Drainage RestorationIRC-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942 - Change Order Form <br />DATE OF ISSUANCE: 12/17/2024 <br />No. 1 <br />EFFECTIVE DATE: 12/17/2024 <br />OWNER: Indian River County <br />CONTRACTOR Southeast Services of the Treasure Coast, Inc. <br />Project: CR512 & N. Broadway St. Drainage Restoration (Fellsmere) <br />OWNER's Project No. IRC -2006 OWNER'S Bid No. 2024036 <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Raising buried manholes, internal grouting to fill and repair pipe surface defects and external <br />pressure grouting of branch connections to the CR512 main drainage line. <br />Reason for Change Order: <br />Defects discovered during cleaning and video inspection of pipes. <br />Attachments: <br />Southeast Services, Inc. Estimate No. 6339, dated 12/3/2024 <br />CHANGE IN CONTRACT PRICE: <br />Description <br />Amount <br />Original Contract Price <br />$215,234.70 <br />Net increase (decrease) of this <br />Change Order: <br />$211,108.00 <br />Contract Price with all approved <br />Change Orders: <br />$426,342.70 <br />A>CCP <br />Boutheast Services, Inc. <br />CONTRACTOR (Signature) <br />Date: p2- q "a <br />CHANGE IN CONTRACT TIMES <br />Description <br />Time <br />Original Contract Time: <br />(days or dates) <br />Final Completion: <br />180 <br />Net increase (decrease) this <br />Change Order: <br />(days or dates) <br />Final Completion: <br />44 <br />Contract Time with all approved <br />Change Orders: <br />(days or dates) <br />Final Completion: <br />224 ' oti;MIsi; <br />RECOMMEND <br />By: Mark Winslow, P.E. <br />ENGINEER (Signature) <br />Date: / Z/ 3/ 2 q <br />Attest: Ryan L. Butler, Clerk of <br />Ci t Court and Comptroller <br />Lucy awk <br />APPROVED: <br />oseph E. Flesher, Ch _ r; n <br />OWNER (Signature) <br />. Ri; fR C OU���:• <br />Date: 12/17/24 •- <br />APPROVED AS TO FORM <br />AND LEGAL SUFFICIENCY <br />" <br />BY W, c ) su r <br />AENNIFSA W. SHULER <br />COUNTY ATTORNEY <br />IRC -2006 -SES -COI -20241217 <br />00942-1 <br />F. Public Works\ENGINEERING DIVISION PROJECTS\2006 CR512 Drainage Restoration (Fellsmere)\t-Admin\Agenda Items\Change Orders\IRC- <br />2006_SES_CO1_20241217.doc Rev. 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.