My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2024 (2)
CBCC
>
Meetings
>
2020's
>
2024
>
10/22/2024 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 9:44:40 AM
Creation date
1/13/2025 9:35:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2024
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: October 1, 2024 <br />To: Indian River County Board of County Commissioners <br />Through: John A. Titkanich, Jr., County Administrator <br />Sean C. Lieske, Director of Utility Services <br />From: Howard G. Richards, PE, Manager — Capital Projects <br />Subject: Florida Department of Transportation Utility Work by Highway Contractor Agreement for <br />Utilities Relocation on CR-510/85th Street from 87th Street to West of 82nd Avenue, FDOT <br />Financial Project ID: 405606.8 <br />Descriptions and Conditions: <br />The Florida Department of Transportation (FDOT) is developing plans to widen County Rd 510 (CR-510)/85th <br />Street between County Rd 512 (CR -512) to 58th Avenue. The CR-510/85th widening is divided into the <br />following four (4) segments identified by the FDOT Financial Project ID: <br />• CR -512 to 87th Street — 405606.7 <br />• 87th Street to West of 82"d Avenue — 405606.8 <br />• West of 82nd Avenue to Powerline Road —405606.5, and <br />• Powerline Road to 581h Avenue — FM#405606.6. <br />The approximately 5.22 miles of existing two-lane roadway will be widened to a four -lane roadway divided <br />roadway with curb and gutter. The proposed roadway improvements will include drainage structures in the <br />form of curb inlets approximately every 500 linear feet. <br />Indian River County Department of Utility Services (IRCDUS) owns and operates two large water and <br />wastewater mains within the existing CR-510/85th Street right-of-way (ROW). Specifically, there is a 12 -inch <br />PVC force main along the south side and a 16 -inch water main along the north side. The force main conveys <br />domestic wastewater from multiple locations including Sebastian River High School, Treasure Coast <br />Elementary, parts of Sebastian and flows generated within the City of Fellsmere. The water main provides <br />potable water to the same locations including Vero Lake Estates, provides looped water service, and is a major <br />transmission main used for fire flow purposes. <br />The FDOT widening of CR-510/85th Street will require relocation of the IRCDUS water and wastewater mains <br />(utilities) within the ROW which is currently undergoing the design phase. On February 28, 2020, the Indian <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.