Laserfiche WebLink
41. Specifications—That part of the Contract <br />Documents consisting of written technical descriptions <br />of materials, equipment, systems, standards, and <br />workmanship as applied to the Work and certain <br />administrative details applicable thereto. <br />42. Subcontractor --An individual or entity <br />having a direct contract with CONTRACTOR or with <br />any other Subcontractor for the performance of a part <br />of the Work at the Site. <br />43. Substantial Completion—The time at <br />which the Work (or a specified part thereof) has <br />progressed to the point where, in the opinion of <br />ENGINEER, the Work (or a specified part thereof) is <br />sufficiently complete, in accordance with the Contract <br />Documents, so that the Work (or a specified part <br />thereof) can be utilized for the purposes for which it is <br />intended. The terms "substantially complete" and <br />"substantially completed" as applied to all or part of the <br />Work refer to Substantial Completion thereof. <br />44. Supplementary Conditions --That part of <br />the Contract Documents which amends or <br />supplements these General Conditions. <br />45. Supplier—A manufacturer, fabricator, <br />supplier, distributor, materialman, or vendor having a <br />direct contract with CONTRACTOR or with any <br />Subcontractor to furnish materials or equipment to be <br />incorporated in the Work by CONTRACTOR or any <br />Subcontractor. <br />46. Underground Facilities—All underground <br />pipelines, conduits, ducts, cables, wires, manholes, <br />vaults, tanks, tunnels, or other such facilities or <br />attachments, and any encasements containing such <br />facilities, including those that convey electricity, gases, <br />steam, liquid petroleum products, telephone or other <br />communications, cable television, water, wastewater, <br />storm water, other liquids or chemicals, or traffic or <br />other control systems. <br />47. Unit Price Work—Work to be paid for on <br />the basis of unit prices. <br />48. Work --The entire completed construction <br />or the various separately identifiable parts thereof re- <br />quired to be provided under the Contract Documents. <br />Work includes and is the result of performing or <br />providing all labor, services, and documentation <br />necessary to produce such construction, and <br />furnishing, installing, and incorporating all materials <br />and equipment into such construction, all as required <br />by the Contract Documents. <br />49. Work Change Directive—A written <br />statement to CONTRACTOR issued on or after the <br />Effective Date of the Agreement and signed by <br />OWNER and recommended by ENGINEER ordering <br />an addition, deletion, or revision in the Work, or <br />responding to differing or unforeseen subsurface or <br />physical conditions under which the Work is to be <br />performed or to emergencies. A Work Change <br />Directive will not change the Contract Price or the <br />Contract Times but is evidence that the parties expect <br />that the change ordered or documented by a Work <br />Change Directive will be incorporated in a subse- <br />quently issued Change Order following negotiations by <br />the parties as to its effect, if any, on the Contract Price <br />or Contract Times. <br />50. Written Amendment—A written statement <br />modifying the Contract Documents, signed by OWNER <br />and CONTRACTOR on or after the Effective Date of <br />the Agreement and normally dealing with the <br />nonengineering or nontechnical rather than strictly <br />construction -related aspects of the Contract Docu- <br />ments. <br />1.02 Terminology <br />A. Intent of Certain Terms or Adjectives <br />1. Whenever in the Contract Documents the <br />terms "as allowed," "as approved," or terms of like <br />effect or import are used, or the adjectives <br />"reasonable," "suitable," "acceptable," "proper," <br />"satisfactory," or adjectives of like effect or import <br />are used to describe an action or determination of <br />ENGINEER as to the Work, it is intended that such <br />action or determination will be solely to evaluate, in <br />general, the completed Work for compliance with <br />the requirements of and information in the Contract <br />Documents and conformance with the design <br />concept of the completed Project as a functioning <br />whole as shown or indicated in the Contract <br />Documents (unless there is a specific statement <br />indicating otherwise). The use of any such term or <br />adjective shall not be effective to assign to ENGI- <br />NEER any duty or authority to supervise or direct <br />the performance of the Work or any duty or <br />authority to undertake responsibility contrary to the <br />provisions of paragraph 9.10 or any other provision <br />of the Contract Documents. <br />B. Day <br />1. The word "day" shall constitute a <br />calendar day of 24 hours measured from <br />midnight to the next midnight. <br />C. Defective <br />1. The word "defective," when modifying <br />the word 'Work," refers to Work that is <br />unsatisfactory, faulty, or deficient in that it does <br />not conform to the Contract Documents or does <br />not meet the requirements of any inspection, <br />reference standard, test, or approval referred to <br />in the Contract Documents, or has been <br />damaged prior to ENGINEER's recom- <br />mendation of final payment (unless responsi- <br />bility for the protection thereof has been <br />General Conditions - 00700 - 3 <br />