Laserfiche WebLink
5.08 Receipt and Application of Insurance <br />Proceeds <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />means, method, technique, sequence, or procedure of <br />construction which is shown or indicated in and <br />expressly required by the Contract Documents. CON- <br />TRACTOR shall be responsible to see that the <br />completed Work complies accurately with the Contract <br />Documents. <br />B. At all times during the progress of the Work, <br />CONTRACTOR shall assign a competent resident <br />superintendent thereto who shall not be replaced <br />without written notice to OWNER and ENGINEER <br />except under extraordinary circumstances. The <br />superintendent will be CONTRACTOR's <br />representative at the Site and shall have authority to <br />act on behalf of CONTRACTOR. All communications <br />given to or received from the superintendent shall be <br />binding on CONTRACTOR. <br />General Conditions - 00700 - 13 <br />