Laserfiche WebLink
in any manner that will endanger the structure, nor <br />shall CONTRACTOR subject any part of the Work or <br />adjacent property to stresses or pressures that will <br />endanger it. <br />6.12 Record Documents <br />A. CONTRACTOR shall maintain in a safe place <br />at the Site one record copy of all Drawings, Specifica- <br />tions, Addenda, Written Amendments, Change Orders, <br />Work Change Directives, Field Orders, and written <br />interpretations and clarifications in good order and <br />annotated to show changes made during construction. <br />These record documents together with all approved <br />Samples and a counterpart of all approved Shop <br />Drawings will be available to ENGINEER for reference. <br />Upon completion of the Work, these record <br />documents, Samples, and Shop Drawings will be <br />delivered to ENGINEER for OWNER. <br />6.13 Safety and Protection <br />A. CONTRACTOR shall be solely responsible for <br />initiating, maintaining and supervising all safety <br />precautions and programs in connection with the <br />Work. CONTRACTOR shall take all necessary <br />precautions for the safety of, and shall provide the <br />necessary protection to prevent damage, injury or loss <br />to: <br />1. all persons on the Site or who may be <br />affected by the Work; <br />2. all the Work and materials and equip- <br />ment to be incorporated therein, whether in <br />storage on or off the Site; and <br />3. other property at the Site or adjacent <br />thereto, including trees, shrubs, lawns, walks, <br />pavements, roadways, structures, utilities, and <br />Underground Facilities not designated for <br />removal, relocation, or replacement in the <br />course of construction. <br />B. CONTRACTOR shall comply with all applica- <br />ble Laws and Regulations relating to the safety of <br />persons or property, or to the protection of persons or <br />property from damage, injury, or loss; and shall erect <br />and maintain all necessary safeguards for such safety <br />and protection. CONTRACTOR shall notify owners of <br />adjacent property and of Underground Facilities and <br />other utility owners when prosecution of the Work may <br />affect them, and shall cooperate with them in the <br />protection, removal, relocation, and replacement of <br />their property. All damage, injury, or loss to any <br />property referred to in paragraph 6.13.A.2 or 6.13.A.3 <br />caused, directly or indirectly, in whole or in part, by <br />CONTRACTOR, any Subcontractor, Supplier, or any <br />other individual or entity directly or indirectly employed <br />by any of them to perform any of the Work, or anyone <br />for whose acts any of them may be liable, shall be <br />remedied by CONTRACTOR (except damage or loss <br />attributable to the fault of Drawings or Specifications or <br />to the acts or omissions of OWNER or ENGINEER or <br />ENGINEER's Consultant, or anyone employed by any <br />of them, or anyone for whose acts any of them may be <br />liable, and not attributable, directly or indirectly, in <br />whole or in part, to the fault or negligence of CON- <br />TRACTOR or any Subcontractor, Supplier, or other <br />individual or entity directly or indirectly employed by <br />any of them). CONTRACTOR's duties and <br />responsibilities for safety and for protection of the Work <br />shall continue until such time as all the Work is <br />completed and ENGINEER has issued a notice to <br />OWNER and CONTRACTOR in accordance with <br />paragraph 14.07.B that the Work is acceptable (except <br />as otherwise expressly provided in connection with <br />Substantial Completion). <br />6.14 Safety Representative <br />A. CONTRACTOR shall designate a qualified <br />and experienced safety representative at the Site <br />whose duties and responsibilities shall be the <br />prevention of accidents and the maintaining and <br />supervising of safety precautions and programs. <br />6.15 Hazard Communication Programs <br />A. CONTRACTOR shall be responsible for <br />coordinating any exchange of material safety data <br />sheets or other hazard communication information <br />required to be made available to or exchanged be- <br />tween or among employers at the Site in accordance <br />with Laws or Regulations. <br />6.16 Emergencies <br />A. In emergencies affecting the safety or protec- <br />tion of persons or the Work or property at the Site or <br />adjacent thereto, CONTRACTOR is obligated to act to <br />prevent threatened damage, injury, or loss. <br />CONTRACTOR shall give ENGINEER prompt written <br />notice if CONTRACTOR believes that any significant <br />changes in the Work or variations from the Contract <br />Documents have been caused thereby or are required <br />as a result thereof. If ENGINEER determines that a <br />change in the Contract Documents is required be- <br />cause of the action taken by CONTRACTOR in <br />response to such an emergency, a Work Change <br />Directive or Change Order will be issued. <br />6.17 Shop Drawings and Samples <br />A. CONTRACTOR shall submit Shop Drawings <br />to ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. All submittals will be identified as <br />ENGINEER may require and in the number of copies <br />specified in the General Requirements. The data <br />shown on the Shop Drawings will be complete with <br />respect to quantities, dimensions, specified perfor- <br />mance and design criteria, materials, and similar data <br />General Conditions - 00700 - 18 <br />