Laserfiche WebLink
IRC -9999 <br />2. ACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTntTGR41aaLl provide copies of the permits to the <br />OWNER and ENGINEER and shall comply wi 'tions contained in <br />the permits at no extra cost to the OWNER. <br />The-QQNTRACTOR shall be familiar with all permit requirements during <br />construction an onsible for complying with these <br />requirements. The cost of this effort s 1511 [)1-: :Juz id in the pay item in <br />which the work is most closely associated with. <br />SC -9.05 Authorized Variations in Work <br />SC -9.05.A. Delete the second sentence in paragraph GC -9.05.A in its entirety. <br />.01 Cost of the Work <br />SC-11.01-A-1`Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences in its place: <br />1. CONTR R will receive payment for actual costs of direct labor and burden (see SC - <br />2.06.6) for the itional or unforeseen work. Labor includes foremen actually engaged in <br />the work; and will noitisclucle project supervisory personnel nor necessary on-site clerical <br />staff, except when the additl I or unforeseen work is a controlling work item and the <br />performance of such controlling wo m actually extends completion of the project due <br />to no fault of the Contractor. Compensate r project supervisory personnel, but in no <br />case higher than a Project Manager's position, sonly be for the pro -rata time such <br />supervisory personnel spent on the contract. In no case an officer or director of the <br />Company, nor those persons who own more than 1% of the C601nKny, be considered as <br />project supervisory personnel, direct labor or foremen hereunder.expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or leg olidays, <br />shall be included in the above to the extent authorized by OWNER. <br />SC -13.03 Test and Inspections <br />SC -13.03.6. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to perform all <br />initial inspections, tests, or approvals required by the Contract Documents except those <br />inspections, tests, or approvals listed immediately below. Subsequent inspections, tests, or <br />approvals required after initial failing inspections, tests, or approvals shall be paid for by the <br />CONTRACTOR by back charge to subsequent applications for payment. The CONTRACTOR shall <br />arrange, obtain, and pay for the following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to paragraph <br />13.04.6 shall be paid as provided in said paragraph 13.04.13; <br />3. tests otherwise specifically provided in the Contract Documents. <br />SC -13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its place: <br />Supplementary Conditions - 00800-8 <br />