My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-IG004
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-IG004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 12:20:12 PM
Creation date
1/16/2025 12:18:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/14/2025
Control Number
2024-IG004
Entity Name
Alzheimer & Parkinson Association of IRC
Subject
Total Memory Workout Class March 5, 2025; March 1, 2025; March 19, 2025 & March 26, 2025
1:30 pm 3:00 pm Room 131 A
Area
Intergenerational Recreation Center
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Applicant's failure to make any of the payments required hereunder in a timely manner shall constitute <br />a material breach and shall result in the immediate termination of this License Agreement. All fees, <br />costs, and expenses, including, without limitation, attorney's fees, incurred by the County in the <br />collection of any payment due hereunder shall be reimbursed by Applicant. <br />8. Applicant (including all artists, performers, entertainers, sound technicians, employees, and <br />subcontractors of Applicant, and any other participating in the production of the Event) shall comply <br />and ensure compliance with the following during the Event: <br />(a) The hours of event production and sound checks utilizing amplified sound in the iG Center <br />are restricted to: <br />i. Sunday through Thursdays from 10:00am-6:00pm with a minimum of one thirty (30) <br />minute intermission. <br />ii. Fridays and Saturdays from 10am-10:59pm with a minimum of one thirty (30) minute <br />intermission. <br />(b) The starting hours listed above may be adjusted to begin earlier upon approval of the County. <br />(c) The location and arrangement of the stages and sounds systems shall be in accordance with <br />the Stage Configuration Map as detailed by Applicant and approved by the County. The <br />preliminary Stage Configuration Map and a Site Plan shall be provided to the County thirty <br />(30) days prior to the Event and a final Stage Configuration Map and Site Plan no less than <br />fifteen (15) days prior to the Event. <br />9. Applicant (including all artists, performers, entertainers, sound technicians, employees, and <br />subcontractors of Applicant, and any other participating in the production of the Event) shall comply <br />and ensure compliance with the following during the Event: <br />(a) The hours of event production and sound checks utilizing amplified sound in the iG Center <br />are restricted to: <br />i. Sunday through Thursdays from 10:00am-6:00pm with a minimum of one thirty (30) <br />minute intermission. <br />ii. Fridays and Saturdays from l Dam-10:59pm with a minimum of one thirty (30) minute <br />intermission. <br />(b) The starting hours listed above may be adjusted to begin earlier upon approval of the County. <br />(c) The location and arrangement of the stages and sounds systems shall be in accordance with <br />the Stage Configuration Map as detailed by Applicant and approved by the County. The <br />preliminary Stage Configuration Map and a Site Plan shall be provided to the County thirty <br />(30) days prior to the Event and a final Stage Configuration Map and Site Plan no less than <br />fifteen (15) days prior to the Event. <br />(d) Sound attenuation blankets or sound walls may be required to be erected at the rear of any <br />temporary stages. Such temporary stage installations shall be installed in such a manner so <br />as to minimize the noise impact on surrounding residential properties. <br />(e) Applicant shall obtain stage inspection, documentation, and certification in accordance with <br />industry standards. Applicant shall provide copies of documentation reflecting certification <br />within 24 hours of Event. Applicant shall also allow the County to inspect the stage <br />construction. Such inspection shall occur no later than 24 hours prior to the Event. Any cost <br />associated by the County's inspection shall be at the sole cost of the County. The County <br />shall make inspector(s) available at a mutually agreeable time. Failure to timely inspect the <br />Stage by the County shall not preclude Applicant from proceeding with the Event. <br />iG License Agreement Page 8 of 19 <br />Initials '�AYy <br />
The URL can be used to link to this page
Your browser does not support the video tag.