Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />"AN L. BUTLER, CLERK <br />Level and survey rod, with the aid of Azimuth stakes and a laser electronic distance <br />measurement device provide infill. <br />The wade portion of the profile is also performed using an Automatic Level, survey rod, and <br />laser and data is collected from the beach berm out to approximately -8' or as the ocean <br />conditions allow. <br />The offshore portion of each profile is collected using a survey vessel equipped with Rypack <br />hydrographic collection software along with GNSS RTK positioning, inertial motion <br />compensation, and Sonar equipment, typically to a distance of 3000' offshore. Sound velocity <br />and Bar Check calibrations are conducted at the beginning and conclusion of daily operations. <br />The three overlapping data sets are then displayed and analyzed in plan and/or profile view as a <br />means of merging the data sets and conducting quality assurance. Merged alignment data are <br />then plotted in profile view along with historic profile data as a final quality assurance procedure <br />prior to the final product being prepared. <br />All data collected will be in accordance with the FDEP-approved Physical Monitoring Plan. <br />M&E will provide the County with beach profile data in ASCII file format together with <br />AutoCAD drawings signed by the surveyor. We will also provide FDEP submittal package. <br />Our prices will be as follows: <br />Task 1: 2025 Winter Profiles <br />Chief Surveyor <br />6.5 hours @ $17 1 /hr .....................................$ 1,111.50 <br />Senior Project Manager <br />4 hours @ $132/hr........................................ $ 528.00 <br />Senior Survey Computer Technician <br />32 hours @ $103/hr...................................... $ 3,296.00 <br />Project Manager <br />17 hours @ $108/hr......................................$ 1,836.00 <br />Assistant Project Manager <br />3 hours @ $85/hr......................................... $ 255.00 <br />Hydrographic Lead Surveyor <br />25.5 hours @ $107/hr................................... $ 2,728.50 <br />Survey Technician (Boat) <br />25.5 hours @$82/hr..................................... $ 2,091.00 <br />Three Man Survey Crew <br />102 hours @$180/hr.................................... $ 18,360.00 <br />Indian River County 2 /2/2/2024 <br />