Laserfiche WebLink
• <br />e! <br />/—())-0/ <br />//r / <br />FOAM 52"10-32 <br />CONSTRUCTION <br />SUPPLEMENTALNO, STATE OF FLOnIDADEPARTMENTOFTrIMSPORTATION. FIN PROJ. <br />LOCALAGENCYPROGRAM 230886-1-58-01 <br />1 SUPPLEMENTAL CONTRACT NO. <br />AGREEMENT A1372 <br />,,, LLVL1l1 N M.L V ZM k-vutNx'x desires to supplement the original agreement entered into and <br />executed on OCT. 5, 1999 All provisions In the original agreement and supplements, if any, remain in OHM except as <br />expressly modified by this supplement, <br />The changes to the agreement are described as follows: <br />PROJECT DESCRIPTION <br />Name RORF.TAMROAD qTD g Length 1 •0 mi 1 e <br />Termini 126th St., Riverwalk Shing Plaza at US #1 <br />Description of Work: Construction of 8' wide recreation path along Roaseland Road <br />Reason forSupolement: Contract for railr--ad improvements exceeded by far the original <br />estimated cnnstt'ttrtinn rngtc_ <br />By. . '& F)_C}RtL P T NT OF TRANSPORTATION <br />AulNorized Signature By: r�i�! <br />NameTtie: Caroline U. , f i nn, Chairman <br />—� Authorized Signature <br />Approved': J mm' 9--, 20Nam-rr-IW <br />AttesL (2 <br />Namn(Tlln' PAT Fi1GIA M. RIDGEIY !/ �L^.��.- /-�y,,gt,�, naln Fxn wnd <br />ESTIMATE FUNDING <br />(t) <br />TYPE OF WORK <br />PREVIOUS ESTIMATED <br />TOTAL <br />PROJECT FUNDS <br />(2) <br />ADDITONAL <br />ESTIMATED PROJECT <br />(3) <br />CURRENT ESTIMATED <br />TOTAL PROJECT <br />(4) <br />TOTAL ESTIMATED <br />AGENCY FUNDS <br />(5) <br />TOTAL ES I IMAT® <br />FEDERAL FUNDS <br />P.E. <br />a. Agency Work <br />b. Other <br />c. State Services <br />— <br />d Total PE Cost Estimate <br />(a b+c) <br />16, 000.00 <br />0 <br />16, 000.00 <br />0 <br />16, 000.00 <br />Right -of -Way <br />a. Agency Work <br />I. Other <br />-- <br />— <br />g. State Services <br />h. Total RAY Estimate <br />(e+f+g) <br />0 <br />0 <br />0 <br />0 <br />0 <br />Construction <br />I. Contract <br />j. Other <br />k. Other <br />I. Other <br />— <br />m. Total Contract Costs <br />(I+j+k+l) <br />Construction Engineering <br />A. Agency <br />-- <br />o. Other <br />— <br />p. State Forces <br />_ <br />q. Total Engineering <br />— — <br />(n+o+p) <br />r. Total Construction Cost <br />Estimate (m +q) <br />213, 000.00 <br />23, 000.00 <br />236, 000.00 <br />0 <br />236,000 00 <br />s. TOTAL COST <br />ESTIMATEOFTHE <br />PROJECT(d+h+r) <br />$229,000.00 <br />$23,000.00 <br />$252,000.00 <br />0 <br />$252,000.00 <br />By. . '& F)_C}RtL P T NT OF TRANSPORTATION <br />AulNorized Signature By: r�i�! <br />NameTtie: Caroline U. , f i nn, Chairman <br />—� Authorized Signature <br />Approved': J mm' 9--, 20Nam-rr-IW <br />AttesL (2 <br />Namn(Tlln' PAT Fi1GIA M. RIDGEIY !/ �L^.��.- /-�y,,gt,�, naln Fxn wnd <br />