My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-012
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:53:20 AM
Creation date
2/20/2025 9:53:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/09/2001
Control Number
2001-012
Agenda Item Number
11.G.1.
Entity Name
Riverwalk Shopping Plaza
Subject
Supplemental Agreement for Roseland Road Sidewalk Improvements
Exceeds Original Estimate
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />e! <br />/—())-0/ <br />//r / <br />FOAM 52"10-32 <br />CONSTRUCTION <br />SUPPLEMENTALNO, STATE OF FLOnIDADEPARTMENTOFTrIMSPORTATION. FIN PROJ. <br />LOCALAGENCYPROGRAM 230886-1-58-01 <br />1 SUPPLEMENTAL CONTRACT NO. <br />AGREEMENT A1372 <br />,,, LLVL1l1 N M.L V ZM k-vutNx'x desires to supplement the original agreement entered into and <br />executed on OCT. 5, 1999 All provisions In the original agreement and supplements, if any, remain in OHM except as <br />expressly modified by this supplement, <br />The changes to the agreement are described as follows: <br />PROJECT DESCRIPTION <br />Name RORF.TAMROAD qTD g Length 1 •0 mi 1 e <br />Termini 126th St., Riverwalk Shing Plaza at US #1 <br />Description of Work: Construction of 8' wide recreation path along Roaseland Road <br />Reason forSupolement: Contract for railr--ad improvements exceeded by far the original <br />estimated cnnstt'ttrtinn rngtc_ <br />By. . '& F)_C}RtL P T NT OF TRANSPORTATION <br />AulNorized Signature By: r�i�! <br />NameTtie: Caroline U. , f i nn, Chairman <br />—� Authorized Signature <br />Approved': J mm' 9--, 20Nam-rr-IW <br />AttesL (2 <br />Namn(Tlln' PAT Fi1GIA M. RIDGEIY !/ �L^.��.- /-�y,,gt,�, naln Fxn wnd <br />ESTIMATE FUNDING <br />(t) <br />TYPE OF WORK <br />PREVIOUS ESTIMATED <br />TOTAL <br />PROJECT FUNDS <br />(2) <br />ADDITONAL <br />ESTIMATED PROJECT <br />(3) <br />CURRENT ESTIMATED <br />TOTAL PROJECT <br />(4) <br />TOTAL ESTIMATED <br />AGENCY FUNDS <br />(5) <br />TOTAL ES I IMAT® <br />FEDERAL FUNDS <br />P.E. <br />a. Agency Work <br />b. Other <br />c. State Services <br />— <br />d Total PE Cost Estimate <br />(a b+c) <br />16, 000.00 <br />0 <br />16, 000.00 <br />0 <br />16, 000.00 <br />Right -of -Way <br />a. Agency Work <br />I. Other <br />-- <br />— <br />g. State Services <br />h. Total RAY Estimate <br />(e+f+g) <br />0 <br />0 <br />0 <br />0 <br />0 <br />Construction <br />I. Contract <br />j. Other <br />k. Other <br />I. Other <br />— <br />m. Total Contract Costs <br />(I+j+k+l) <br />Construction Engineering <br />A. Agency <br />-- <br />o. Other <br />— <br />p. State Forces <br />_ <br />q. Total Engineering <br />— — <br />(n+o+p) <br />r. Total Construction Cost <br />Estimate (m +q) <br />213, 000.00 <br />23, 000.00 <br />236, 000.00 <br />0 <br />236,000 00 <br />s. TOTAL COST <br />ESTIMATEOFTHE <br />PROJECT(d+h+r) <br />$229,000.00 <br />$23,000.00 <br />$252,000.00 <br />0 <br />$252,000.00 <br />By. . '& F)_C}RtL P T NT OF TRANSPORTATION <br />AulNorized Signature By: r�i�! <br />NameTtie: Caroline U. , f i nn, Chairman <br />—� Authorized Signature <br />Approved': J mm' 9--, 20Nam-rr-IW <br />AttesL (2 <br />Namn(Tlln' PAT Fi1GIA M. RIDGEIY !/ �L^.��.- /-�y,,gt,�, naln Fxn wnd <br />
The URL can be used to link to this page
Your browser does not support the video tag.