Laserfiche WebLink
40 <br />40 <br />40 <br />Indian River County Erosion Control Program <br />NEPA Documentation Service Contract <br />Scope of Services <br />Task Descriptions <br />Task 1 Kick Off Meeting and Data Collection. The contractor will attend a kickoff meeting with <br />County staff to discuss content, schedule, and approach to the project. The contractor will review <br />available information and identify any additional information required for document preparation and <br />collect available information from local sources, including Harbor Branch Foundation, Florida Institute of <br />Technology and various state and federal agencies. Other items such as agency contacts, mailing list <br />preparation, and individual responsibilities will be discussed. The County will provide all available <br />information to the consultant in a timely manner. <br />Task 2 Informal Scoping Meetings. The contractor will conduct informal coordination meetings with <br />various resource agencies (i.e., Corps, NMFS, USFWS) to determine potential areas of controversy or <br />relevant issues regarding the proposed project. An topical element outline for the EA and Cumulative <br />Impact Assessment will be prepared and forwarded to the agencies prior to attending any meetings. <br />Potential mitigation for project impacts will also be discussed. Minutes of each meeting will be prepared <br />and distributed electronically to all attending parties. <br />Task 3 Prepare Preliminary Draft Environmental Assessment for Segment 1 and 2. The contractor <br />will prepare a preliminary Draft Environmental Assessment for review by the County (3 copies) based on <br />the attached outline. The contractor will attend a review meeting with the County to address comments <br />by County staff. The contractor will incorporate any comments agreed upon by the County and prepare a <br />revised preliminary Draft Environmental Assessment for submittal to the Corps of Engineers. The <br />county's engineering consultant shall provide relevant plans and text regarding the preferred alternative <br />and other engineering and economic information that may be required. Relevant sections to be prepared <br />by the county or their coastal engineering consultant are designated on the attached outline. Draft text and <br />appropriate materials for these sections of the EA will be electronically provided to the contractor. <br />Task 4 Review Meeting and Prepare Draft Environmental Assessment. The contractor will submit <br />the revised preliminary Draft Environmental Assessment to the Corps of Engineers for their review (2 <br />copies) and will also attend a review meeting with the Corps to discuss comments on the document. The <br />contractor will incorporate any comments agreed upon by the County, Corps, and prepare the Draft <br />Environmental Assessment for distribution and comment. One original and 30 copies will be prepared for <br />distribution. It is assumed the county will handle distribution. <br />Task 5 Prepare Notice of Availability of DEA. The contractor will prepare a Notice of Availability of <br />the Draft Environmental Assessment to be published in the Federal Register by the Corps of Engineers <br />and in the local newspaper to be submitted by the county. <br />Task b Prepare Draft Final Environmental Assessment. The contractor will review all comment <br />letters received on the Draft Environmental Assessment and will incorporate revisions in response to <br />relevant comments within the Draft Final Environmental Assessment. <br />